Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 16-2671: BOMO KORAL SIDEWALK <br />RENOVATIONS <br />Construction Contract <br />$ <br />71,099.00 <br />Contract Administration <br />$ <br />2,765.00 <br />Inspection and Testing <br />$ <br />7,900.00 <br />Contingencies <br />$ <br />52136.00 <br />TOTAL ESTIMATE® CONSTRUCTION COSTS <br />$ <br />133,900.00 <br />EXHIBIT 4 <br />23A-35 <br />