My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Clerk
>
Contracts / Agreements
>
S
>
SANTA ANA UNIFIED SCHOOL DISTRICT (8)
>
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 10:48:45 AM
Creation date
4/11/2017 10:42:08 AM
Metadata
Fields
Template:
Contracts
Company Name
SANTA ANA UNIFIED SCHOOL DISTRICT (SAUSD)
Contract #
A-2017-044
Agency
Community Development
Council Approval Date
3/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. SAUSD will purchase the needed paint and supplies, including paintbrushes, <br />paint rollers, rolling pans, drop cloth, masking tape, latex gloves, and cups for <br />blending/mixing pain. SAUSD must provide its own additional supplies if needed. <br />C. Project <br />1. Each School will paint the utility box assigned to it by the City, and nothing more. <br />Schools can commence work after the effective date of the contract. Painting of <br />the box must be completed by June 9 , 2017. Painting may only <br />occur during the hours of 7 a.m. to 7 p.m. A minimum sidewalk clearance of four <br />feet must be adhered to at all times. <br />2. Artwork must include all visible sides of the utility box including the top. <br />3. Each School shall provide for City maintenance, operations, and emergency <br />access to its respective utility box at all times. <br />4. Reserved. <br />5. Artwork may not contain advertising, religious art, sexual content, negative or <br />violent imagery, convey politica[ partisanship or include any hidden, subliminal or <br />camouflaged messages or statements of any kind or nature. <br />6. Artwork may not include any breach of intellectual property, trademarks, brands, <br />images of illegal activity or involve the attachment of any objects to the box. <br />7. The Schools shall ensure that any areas utilized for the project are maintained <br />and restored to a well-maintained, safe, sanitary, and clean condition, and kept <br />free of any hazardous waste at all times. All equipment associated with the <br />installation of the artwork, trash and debris shall be removed and cleaned up on <br />a daily basis. The Schools shall place a drop cloth or similar barrier on the <br />ground below the artwork while installation is underway, which barrier shall be <br />removed each day upon completion of an installation session. <br />D. Property Rights <br />1. SAUSD hereby waives any legal rights under Federal, State, local, and/or <br />Administrative law to maintain the artwork upon City property. The completed <br />work will be the property of the City, which retains the sole and absolute right and <br />discretion to remove, modify, or replace the utility box, components of the utility <br />box, or the artwork if necessary without compensation or notice to the SAUSD, <br />2. SAUSD grants the City the right to use any images, photographs or video of the <br />artwork and the installation process for publicity or promotional purposes and <br />agrees that the results of such activity shall remain the sole property of the City. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.