Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO,: 16.114 <br />SUI3h[iI2TACFJIT'1'fh[T�'I YCdIItiE13ltI.tiGSLRVIChS <br />• All completed reports shall be certifiod to be correct and signed by a professional land surveyor <br />registered in California. (Only if required by the Engineer). Work under this category will be <br />paid on hourly basis. <br />• Backfrll all test holos shall be baekfilled with in -kind material and compact to a relative <br />compaction of 90 %. <br />• Boretwles greater than 2111 shall be paved and match existing pavement thickness section unless <br />stated otherwise and or approved by the Engineer. <br />Clean and sweep work site at the end of the work day. <br />• Provide additional surveying, and underground utility mapping services at uin hourly rate <br />GetieM LMgiremenfs rand Pa oiect i)elivea° abler° <br />All work for this work for traffic control shall be done in accordance with the Federal Highway <br />Administration's Manual (MCJTCD) <br />• The selected firaVs shall obtain all necessary permits from the City and local jurisdiction prior to <br />commencing any of the work in Public Right of Way. <br />Any work required on private property shalt be authorized by the Engineer prior to comniencem"nt <br />of work. <br />All work shall be done in accordance with ASCE Standard 38 -02; Suindard Guideline for the <br />collection and depiction of the existing subsurface utility data. <br />• <br />'file firr;rs shalt secure all permits to work in the City. These fees are not reirnbursable. <br />All work shall be perfom -tcd to the specific project and or location as detailed it,, the notice to <br />proceed and indicated by the Engineer. <br />+ All reports and technical memoranda shall be submitted etectrorucally to City and shall include all <br />the information as required and detailed in the notice to proceed, All Computer Aided Drafting <br />Design (CARD) work shall be submitted on electronic format (Microstation). In addition, a hard <br />copy of the project findings and a dighat file in. Microstatiou shall be submitted to the engineer for, <br />review before final approval and final payment is authorized, <br />A list of positions and hourly rates shall be included as part of the proposal and included in the seal bid <br />package, See Attachment 4 — ADI)rric)NAL PROVISIONS for a sample breakdown, <br />The consulting firms are responsible for anydaniage to utilities during the locating efforts. <br />C011Staltaant ResJoonsibil.1tics: <br />.Q()n3Ultlnt Auulit_a`tl Rey.izr+, Poce;is: Prior to awarding the con`.ract, the selected Consultant shall be subject to <br />an audit or review by Caltran. Audits and bnvestigatious (A8,t), other state wa(lit organizations, or the federal <br />government. The selected Consultant shall complete Exhibit 10 -F — Consultant Certificat'ion Contract GosU <br />and Financial, in the Appendix of this RFP as Attachment 4. <br />Time is of the asenco and work shall commence within .S days of the Notice to Proceed for planned <br />Underground utility locating S::I"V lcu "S, <br />251 -27 <br />