Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 16-t4l <br />ON -CALL RIC HT OF WAY COORDINATOR <br />SCOPE OF WORK <br />Introduction and Background: <br />The City of Santa Ana is issuing this Request for Proposals (RFP) to seek a qualified Might -of -Way <br />Consultant to ,provide right -of -way coordinating services for the City of Santa Ana Public Works Agency <br />on an as- needed basis. From the proposals received, it is the City's goal to select one firm to enter into <br />agreement for a not to exceed amount of $5(7(7,000. <br />Minimum Qualifications: <br />Consultant qualifications mast demonstrate tine minimum qualifications as established in the California <br />Department ol'Transportation (Caltrans) Right or Way Manual which can be accessed at: <br />http : / /www,(lot,ca.gov /hq /row /i,owman/manual /index. ham. <br />Description of Work: <br />Consultant under contract with the City of Santa Ana will provide support and services to City of Santa Ana <br />staff or their designee on an as- needed basis. 'The Consultant shall be thoroughly familiar with the Statement of <br />Work prior to submitting a response to this Request for Proposal ('RFP). <br />• The Consultant shall perform work to produce a high quality, professional and complete work product, <br />• Consultant roust have experience with State and Federally funded projects. All work shall be ,performed <br />in conformance with all applicable regulations, policies, procedures and standards. <br />• Work, may include, but not be hnuted to, the following: onsite review of the project area; review of <br />existing records; conducting research and performing analysis; information gathering; negotiations; <br />development of strategies. <br />• The Consultant shall carry out the instructions received from the City and shall cooperate with the City <br />and other agencies, <br />• <br />The Consultant has total responsibility for the accuracy and completeness of the work produced. The <br />work will be reviewed by the City for conformity with the requirements of the Agreement, Reviews by <br />the City may NOT include a detailed review for the accuracy of items submitted. The responsibility for <br />accuracy and completeness; of such items remains solely that of the Consultant. <br />• The Consultant shall be responsible for coordination and supervision of all work performed by its sub - <br />consultants. The Consultant shall review all work performed by its sub - consultants and the <br />responsibility for accuracy and completeness of work performed remains solely that of Consultant. <br />+ <br />'The Consultant shall have a Quality AssuranccJ uality Control (QA /QC) plait in effect during the entire <br />time work is performed under the Agreement. The QA /QC plan is intended to ensure that the appraisals, <br />maps, reports, plans, studies, estinthtes, agreements and other documents submitted under assigned Scope of <br />Work are complete, accurate, checked, and proofread to mect professional standard practice requirements, <br />25M -11 <br />