My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25P - AGMT - DEV IMPACT STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/18/2017
>
25P - AGMT - DEV IMPACT STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 11:14:23 AM
Creation date
4/13/2017 5:47:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25P
Date
4/18/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II 0 SCOPE OF SERVICES & <br />SCHEDULE <br />�t✓��.���Wf����3 J� � t4 ti�i k�� 1 1' Y i f 4 i N!T tM3k } 5 _2 p ih <br />Work products stemming from the Work Plan described in this section will include the following: <br />• A memorandum summarizing the fee methodology options <br />• The draft and final Fee Study or Fee Studies <br />DTA has an enviable reputation for producing high quality work in a quick and efficient manner to <br />correspond with even the most aggressive project schedule. DTA's clients also receive high levels of <br />personal attention from senior staff, with a Managing Director or other senior management always <br />available to meet with public agency staff and other groups. <br />TASK 1 — EVALUATE CURRENT DIF PROGRAM <br />DTA will review and evaluate the City's current DIF program, including review of General Plan, level of <br />service, Capital Improvement Programs, existing levels of development, projected future growth, and <br />all other required data, for discussion during the Kickoff Meeting in Task 2. <br />TASK 2— ATTEND KICK -OFF MEETING <br />DTA staff will meet with City staff in an initial kick -off meeting to finalize the details of the Work Plan; <br />discuss the current DIF program, potential fee methodologies, and best practices; identify needed and <br />available information (i,e., reports, project /needs lists, stakeholder groups, data, etc.); determine period <br />of time to be examined in Fee Study; prepare final schedule; discuss the public process; and resolve <br />other concerns as appropriate. <br />TASK 3 — REVIEW AND CONFIRM DEVELOPMENT PROJECTIONS <br />7 <br />DTA will review Southern California Association of Governments Regional Transportation system <br />growth projections, as well as other sources, such as the City General Plan, existing Master Plans, the <br />City's Transportation System Improvement Area DIF, the U. S, Census, and the State Department of <br />Finance. DTA will consult with the City Community Development Department to ensure growth is <br />consistent with the City General Plan and projections. Also, DTA will survey and compile results to <br />determine development impact fees charged by ten similar cities within the region, with at least four <br />from Orange County, <br />TASK 4 - REVIEW FACILITY if CAPITAL NEEDS AND LEVELS OF SERVICE <br />This task entails review of the facility and capital needs required to serve the new development in the <br />study area projected in Task 3. DTA will use existing City materials (and any relevant developers' <br />facilities reports) as base documents and focus our effort on updating this information. <br />In order for any fee program to be comprehensive in its scope, it is necessary to complete a thorough <br />identification and review of all the facilities which will be impacted by additional growth, including those <br />already discussed in the General Plan or CIP. This task will require close coordination with all <br />appropriate City departments. <br />Subtask 4(A) — Survey /Interview City Staff <br />DTA shall survey /interview City staff to review projected facilities in the City, along with major <br />equipment needs, the timing at which improvements will be needed, and any physical data that <br />would assist in developing the costs estimated below in Subtask 4(C). Based upon the results <br />of the surveys and interviews, as well as the City General Plan, DTA will verify and, if <br />appropriate, expand the list of new facilities to be financed through the DIF Program. <br />Subtask 4 (8) — Facilities List <br />Inc. <br />Development Impact Fee Study <br />25P -12 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.