My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - BIKE LANES - 5TH ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
05/02/2017
>
20A - AA - BIKE LANES - 5TH ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:32:54 PM
Creation date
4/27/2017 3:09:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
5/2/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are not accounted for in this scope. We have included preparation of one addendum with responses to <br />contractor's request for information as part of this task. <br />Deliverables: One Addendum, Design Revision for Addendum <br />Task 14: Construction Phase <br />Kimley -Horn will assist the City during the construction phase by responding to contractor's RFIs, preparing <br />addendums and providing clarifications. This also consists of reviewing contractor's change orders and changed <br />conditions in the field. Changes in the overall design concept are not part of this scope. A 12 -month construction <br />duration is assumed. We have included: one meeting, up to six RFIs, up to eight contractor submittal reviews, <br />one field observation, and one addendum. <br />Kimley -Horn will prepare record drawings by updating the approved design drawings based on one set of <br />redline markups provided by the Contractor or City staff. Independent verification is not included in this scope. <br />Significant deviations from the original design documents are not accounted for in this scope. The purpose of the <br />record drawings is to create a deliverable that will represent the built condition for the City's records as recorded <br />by the Contractor. <br />Deliverables: Record Drawings - 1 hardcopy and 1 electronic (both PDF format and Microstation V81) <br />Optioltal Items <br />Potholing: Provide vacuum excavation potholes to positively identify utilities where conflicts may exist. This data <br />will be used for traffic signal modifications and other potential conflict locations with the proposed improvements. <br />Up to two days of potholing are included in this optional scope (approximately ten potholes). <br />Deliverables: Potholing Report (four copies) <br />Assumption: All Plans, and Specifications submittals for 30 %, 60% and 90% will be in electronic (PDF, Word) <br />format. One final submittal will be hardeopy. Mass production is not included as part of the scope of work. <br />OTAMW <br />Kimley >Morn <br />20A -18 <br />TRED77007.17 I City of Santa Ana <br />• 4/19 <br />Research <br />1 <br />ise Mapping <br />LVA <br />to <br />NM <br />NNIN <br />y <br />>n and Estimate <br />WAWA <br />f <br />ms, and Estimate <br />- WX <br />0 <br />ions, and Estimate <br />W <br />20A -18 <br />TRED77007.17 I City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.