My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - WATER QUALITY TESTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
05/02/2017
>
25E - AGMT - WATER QUALITY TESTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:37:33 PM
Creation date
4/27/2017 3:10:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
5/2/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement Exhibit B <br />EXHIBIT C <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS FOR WATER QUALITY SAMPLING & TESTING SERVICES <br />PROPOSERS CERTIFICATION and PROPOSAL ITEM PRICING <br />Certification - I certify that I have read, understand andagree to the terms and conditions of this Request for <br />Proposals. I have examined the Scope of Services (Exhibit A) and am familiar with the scope of work <br />locations. I am familiar with all the existing conditions and limitation that may Impact work requests. I <br />understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for <br />clarification prior to the submission of my proposal. <br />Proposal Item Price • Pricing shall be basedon a(hourly cost, time and materials basis - see narrative) for <br />services described In Exhibit A. f=ee must be Inclusive of all costs, Including but not limited to, direct and <br />Indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. Any special materials will be <br />purchased by the contractor only after discussed and authorized by the City projects manager or designee in <br />writing, Proposer shall attach a separate hourly rate schedule with hourly rates for staff time per lob <br />,plassffjaatfon. if the City requires additional related services not listed in the fee schedule below, those <br />services will be performed and compensated at time and materials costs as shown on the proposer's hourly <br />rate schedule submitted. Quantities listed below are annual estimates, the City reserves the right to increase <br />or decrease quantities as necessary, <br />LINE'' <br />DESCRIP f10N <br />QUANTITY <br />UNIT <br />UNIT <br />PRICE <br />EXTENDED TOTi {�h <br />PRICE <br />Routine Weekly Samples collected and <br />1 <br />tested by Consultant for Bacteriological <br />2,600 <br />Each <br />$12.50 <br />$32,500.00 <br />Quality, Heterotrophic Plate Count and <br />Chlorine Residuale <br />Routine Monthly Samples collected and <br />2 <br />tested by consultant for General <br />600 <br />Each <br />$6,00 <br />$3,600.00 <br />Ph sisal Quality <br />3 <br />Routine Monthly Samples collected and <br />1 ?0 <br />Each <br />$8.00 <br />$960.00 <br />tested by consultant for Fluoride <br />Routine Quarterly Samples collected by <br />4 <br />City and tested by Consultant for <br />48 <br />Each <br />$6 oo <br />$2,880.00 <br />Haloacetic Acids <br />Routine Quarterly Samples collected by <br />5 <br />City and tested by Consultant for <br />48 <br />Each <br />$30.00 <br />$1,440.00 <br />Trihalomethanes <br />Routine Monthly & Quarterly Samples <br />6 <br />collected by City and tested by Consultant <br />96 <br />Each <br />$16.00 <br />$2,496.00 <br />for Nitrates/Nitrftes <br />Non - Routine samples collected by City <br />and tested by Consultant for <br />7 <br />Bacteriological Quality, Heterotrophic <br />100 <br />Each <br />$9.00 <br />$900.00 <br />Plate Count and Chlorine Residuals <br />As- Needed <br />Non- Routine samples collected by City <br />8 <br />and tested by Consultant for General <br />t 00 <br />Each <br />$4.00 <br />$400.00 <br />Physical Quality As- Needed <br />RFP #14 -01 % — Water COuality Sampling & Testing Services <br />Page 21 <br />2391-'25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.