Laserfiche WebLink
P <br />PROPOSAL — Novm er 11,201 <br />Diana Lehman <br />Lehman Construction, Inc. <br />info@Iehmanconstruction.net <br />SERVICE <br />Prevaiilri ytlage 5erviee item Price . <br />Single Lane Closure: Set and Leave Daily <br />Monday through Friday between the hours of 7:00AM and 4.OMPM, <br />9 hours part to perk. Includes 1 technician, 1 traffic control vehicle, 1 arrow $725.00/day <br />board, and all necessary traffic control devices based upon the scope of work. <br />Please note overtime explanatlon below. <br />Overtime Efate — Prevailing Wage M -F <br />Prevailing Wage overtime rates apply If job exceeds g hours per day on the $85.00/ hour/tech <br />jc b site. <br />I Overtime Rate Standard M -F <br />�Overtime charges apply if job exceeds 8 hours including travel time for $70.00/hour/tech <br />demabilixatlon, part to part. <br />* This is a prellntinary quote based on the details provided, It is subject to charge if <br />the supe of work changes. <br />Payment teras: Prepaid. <br />* Proposal valid 30 days. <br />Thank you for the opportunity to present this proposal. We look forward to working with you on . <br />this proje& If you require additional Information or have any questions, please do not hesitate <br />to give us a call. <br />Sincerely, <br />adl Hurst <br />