My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEHMAN CONSTRUCTION, INC.,
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
LEHMAN CONSTRUCTION, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 3:33:25 PM
Creation date
4/28/2017 3:50:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEHMAN CONSTRUCTION, INC.,
Contract #
14-7513
Agency
Public Works
Council Approval Date
3/21/2017
Expiration Date
1/19/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vicente Sarmiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. David Benavides <br />Michele Martinez <br />Roman Reyna <br />Sal Tinajaro <br />December 15, 2016 <br />ADDENDUM No. FOUR <br />CITY OF SANTA ANA <br />20 Civic Center Plaza • P.O. Box 1988 <br />Santa Ana, California 92702 <br />www.santa-ana.org <br />SUBJECT: PROJECT No. 14-7513: Pacific Electric Park <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OFTHE COUNCIL <br />Maria D, Huizar <br />The following changes have been made to the plans and specifications of the subject <br />project: <br />Plans <br />1. Replace sheet E-5.01 (sheet 66 of 71) with new attached sheet E-5.01. <br />2. Replace sheet E-6.01 (sheet 71 of 71) with new attached sheet E-6.01. <br />3. Sheet E-5.01 LIGHTING FIXTURE SCHEDULE, TYPE P1, MANUFACTURER <br />AND MODEL NUMBER: Delete existing light pole specification and replace with <br />new light pole specification as follows: <br />Stresscrete #SCL-KD135-G-E80-FBP-C/W 140-25130-A THH-JES, or approved <br />equal. <br />4. Sheet E-5.01 LIGHTING FIXTURE SCHEDULE, TYPE P2, MANUFACTURER <br />AND MODEL NUMBER: Delete existing light pole specification and replace with <br />new light pole specification as follows: <br />Stresscrete #SCL-P110-APR-G-E$0-ATHH-JES, or approved equal. <br />Specifications <br />Appendix A, Definition of Bid Items, Bid Item No. 9 — Electrical Service — Pole to <br />Point of Connection (POC): revise paragraph to read as follows: <br />Payment for Electrical Service -- Pole to Point of Connection (POC) shall be at the <br />contract lump sum bid listed in the Bid Proposal, and shall include full <br />compensation for doing all work, including provision of wire, conduit, coordination to <br />bring in new electrical service from service pole ("Pole') to new electrical panel <br />(POC), furnishing all materials, labor, equipment, tools, and incidentals as required <br />
The URL can be used to link to this page
Your browser does not support the video tag.