My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR., (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2017 1:08:41 PM
Creation date
5/8/2017 3:53:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY;ORANGE COUNTY FLOOD CONTROL DISTR.; IRVINE RANCH WATER DISTR.,
Contract #
A-2016-180
Agency
Public Works
Council Approval Date
7/5/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br />RESPONSIBILITIES OF NEWPORT BEACH <br />4.1 General Responsibilities <br />NEWPORT BEACH shall review the Project's plans and financially contribute toward the <br />Project Fund as indicated_ in Exhibit C2. <br />4.2 Environmental Review-, Permittin <br />NEWPORT BEACH shall comply with all of the commitments and conditions set forth in the <br />environmental documentation, environmental permits, approvals, and applicable agreements <br />obtained for the Project as those commitments and conditions apply to their responsibilities <br />under this Agreement. Notwithstanding the foregoing, NEWPORT BEACH through its <br />designated Project Representative shall review and approve all permit conditions and other <br />resource agency approvals that affect the construction and O&M of the Facilities, or any portion <br />thereof within its jurisdiction and in, on, or about its right-of-way as to its respective compliance <br />with applicable Regulations. <br />4.3 Design <br />NEWPORT BEACH shall review all draft and final Project design reports, and PS&E submitted <br />for their approval and shall have its Project Representative respond in writing to SANTA ANA <br />as to a submittal's review for approval in a timely manner. Subsequent to approval of the final <br />design, any material design change variance shall require mutual approval by the Project <br />Representatives. <br />4.4 Right of Way <br />As indicated in the Preliminary Plan Exhibit B) no pipelines for the Project are proposed to be <br />installed within the public right-of-way of NEWPORT BEACH. However, in the event the final <br />design necessitates the use of public right-of-way and in order to reduce Project costs, provided <br />that a request is in compliance with all permits and regulatory approvals, NEWPORT BEACH <br />shall allow the Project Facilities or portion thereof (including the aforementioned pipelines) to <br />be constructed, operated, and maintained, after an appropriate review, within its respective right <br />of way. Any additional project costs shall be shared by the Parties other than OCWD and IRWD. <br />4.5 Construction <br />NEWPORT BEACH shall waive any costs or fees with respect to the permits issued by it in <br />furtherance of the Project. The terms and conditions of the permits shall be consistent with this <br />Agreement, and in the case of a conflict, the terms and conditions of this Agreement shall <br />control. <br />Prior to SANTA ANA's construction completion of the Diversion Structure and other Facilities, <br />NEWPORT BEACH shall have its respective Project Representative conduct a walk-through to <br />promptly review the improvements and provide any comments. Upon satisfaction of any and all <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 Page 23 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.