My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL PUMP COMPANY, INC-2016
Clerk
>
Contracts / Agreements
>
G
>
GENERAL PUMP COMPANY, INC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:09:53 AM
Creation date
5/8/2017 3:54:59 PM
Metadata
Fields
Template:
Contracts
Company Name
GENERAL PUMP COMPANY, INC
Contract #
A-2016-313
Agency
Public Works
Council Approval Date
11/15/2016
Insurance Exp Date
2/5/2022
Destruction Year
0
Document Relationships
GENERAL PUMP COMPANY, INC
(Amended By)
Path:
\Contracts / Agreements\G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CffY OF SAN A ANA <br />R. P N04 10-090 <br />WK['ER WELL, PUMP AND N[OTOR RE AIR S1=✓kVICES <br />1. Visually inspect cells and windings for excessIve wean,signs of conductoroverheating or fatigue <br />that possibly would not. be a:ppaiDnt during an 610etrical test. <br />2. Alf stators shall be surge- tested wl't. n electronic, surge tpsEer specifically designed 'tc apply a <br />surge voltage stress test siCriulfiaheausly betvvec�r� tcir"ns d a coil,. bat var o' n phatsas, f"rom, vifn.ding to <br />grsoUhd artd to doted short-clreulted turns in windinb .under test. Vesting shall Na Pea E'ASA,II Eli <br />622, 112 and 7.2.E ,.tandards, infrared imaging shall. be provided pre,and pest test. <br />d. Meohanfcal fit <br />I , Measure the b.eadhg bores, shells, housings and shaft journals LISOg a micrometer. Shaft r"its and <br />housing fits Shall cot.oly with AR100-2015, Machine work shall be approv6d by the Engineer <br />l�efora tieing performed or machine work may not be paid for,: Bearing journals, seal surfaces and <br />bearing housing restoratlon shall be done by matafting and machining or baring and sleeving. <br />Documentation of before and after measurements shall be rnade-r. <br />2. replace bearings per manufacturer's specifications. All grease fittings, plugs, etc, shall be replaced <br />unless otherwise indicated by the Engineer. Bearings shall be properly lubricated and bearing oil <br />reservoirs .aball drained for shipping an:d' installation. The Contractor shall. be responsible for filling <br />the bearing ail reservoir upon installation. Alf equipment shall be tagged with lnformatlon as to <br />whether or not bearing oil reservoirs were flflecl and what type of lubricant was used. <br />e, Rotor Balancing <br />1, All raters of motors rated at.50 HP/3600l1300. RPM and above shall be dynarriieafly balanced,. with <br />the rotor running at rated speed where practical, but not less than 600 RPM ir7 thebalance stand. <br />The: balancing speedshall alab be rapid enough so the ba.lamce mane sensitivity can reliably <br />measure the maximum allowable residua! imbalance. <br />2. A printout tape from the balance/analyzer shall be furnished d'etalling the final balance values. This <br />tape wiilbe attached. to the. r'dc6nd1tioh/repairlrew1nd documents when the (notor is delivered. <br />f. Niator t.�ads <br />Motor leads shW pe permanently tagged with non-magnetic Markers. Mb.Cor lead configuration shall <br />not be altered, <br />g.. lnsulati:oT <br />1., Windings aha. II, be double-dlpp�d with Class .H varrr,i.sl . a.nd faked, <br />2. Mach fne-lris:had surfaces laore of the stator lamination and pe.rirp:hery, of the rotor laminations shall <br />ber cleaned ol"oll varnish and foreign materiais. Photo documentation of this. process shall be made <br />prier t5 and, after la nInatldn. <br />Fina I Test <br />1, A 1000 volt meg-ohm meter shall be used to verlfj insufa.ticn continuity, This reading shall be - <br />documented, ,After reassembly, motor skull be test: -run at rated voltage and freouencyl, No load <br />voltage and phase currents shall be recorded. Vibration mils displacement shall be measured and <br />recorded in the horizontal, vertical and axial planes on both ends of the motor, or top and bottom of <br />vertical motors and documentation of current reading and vibration readings shall be provided to the <br />�ngireer. <br />2, A xKV meg-ohm motor shall be used to verify insulation continuity of all 4160V motors,. <br />i, Paint <br />1. Exterior of motorshall be properly cleaned of rust and foreign material, prime painted and finish <br />painted with a goad grade cif machinery enamel, the same color as. received unless otherwise <br />specified.. Nameplates, machined surfaces and internal parts shall be protected from paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.