My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL PUMP COMPANY, INC-2016
Clerk
>
Contracts / Agreements
>
G
>
GENERAL PUMP COMPANY, INC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:09:53 AM
Creation date
5/8/2017 3:54:59 PM
Metadata
Fields
Template:
Contracts
Company Name
GENERAL PUMP COMPANY, INC
Contract #
A-2016-313
Agency
Public Works
Council Approval Date
11/15/2016
Insurance Exp Date
2/5/2022
Destruction Year
0
Document Relationships
GENERAL PUMP COMPANY, INC
(Amended By)
Path:
\Contracts / Agreements\G
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />IRFP NO„ 16.090 <br />WATER WELL, PUMP AND MOTOR REPAIR SERVICES <br />terminals -or lugs 1-- - 5 <br />Teilus 68 oil LS 1 _ _15 15 <br />Rewind€ng of Electric Motor LS 1 S,OOi <br />Well Work -- - -- - - _ _ <br />Mobilization &set-up <br />~ ----- — - <br />1 <br />2,J00 <br />00.0 <br />tinder Water video; of well (before) <br />Wire brushing of well section under water & Ea. <br />1 <br />erl•orations <br />3,000 <br />3 000 <br />Chemical treatment during wire. brushing (optional) 2 LS <br />1 <br />120,000 <br />Ba l.& dispose of ell'd€rt:& debris Set <br />1 <br />..2,000 <br />21 00 <br />SONAR Jet of perforations (420 feet, three intervals) 3 LS <br />1 <br />5000 <br />5 000 <br />Under Water video of Well. (after) LS <br />1 <br />1 100 <br />1 1 O0 <br />Demo biliiation�.& pick-up LS <br />1 <br />Proposed new pump: Make: Natlgnal , Model No.: H14MC GPM; .3,000 TOR <br />off:: <br />1. Motor refurbishing includes shop'work, labor and material to perform the following: disassembling; <br />steam cleaning, inspection; replace bearings, heaters, dipping (ono thin layer, baking, reassembling, <br />testing) <br />2.. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment Is applied., the bid price must include cast of the chemicals, chemicals handling.(appiication <br />mixing), used chemicals neutralization and disposal.. <br />3; Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc, (714) 6324003 <br />4. Chemical treatment during wire: brushing will not be used In the evaluation of the bids, If chemical <br />treatment is ,applied, the bidprice must include cost of the chemicals, chemicals 'handling (application <br />mixing), used chemicals neutralization and disposal,. <br />5. Pump base will be. replaced, and attached to.existing discharge pipe, If Welding is deeded, will be:bill at <br />time and material;. <br />6. Concrete around the pump base will have to be removed and. replaced. <br />7. New Stainless Steel line for sounding will be provided. and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />8, Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 28 feet when operating at full -rated load. Soundproofing solution to be <br />approved by the Engineer. <br />151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.