Laserfiche WebLink
CITY OF SANTA ANA <br />IRFP NO„ 16.090 <br />WATER WELL, PUMP AND MOTOR REPAIR SERVICES <br />terminals -or lugs 1-- - 5 <br />Teilus 68 oil LS 1 _ _15 15 <br />Rewind€ng of Electric Motor LS 1 S,OOi <br />Well Work -- - -- - - _ _ <br />Mobilization &set-up <br />~ ----- — - <br />1 <br />2,J00 <br />00.0 <br />tinder Water video; of well (before) <br />Wire brushing of well section under water & Ea. <br />1 <br />erl•orations <br />3,000 <br />3 000 <br />Chemical treatment during wire. brushing (optional) 2 LS <br />1 <br />120,000 <br />Ba l.& dispose of ell'd€rt:& debris Set <br />1 <br />..2,000 <br />21 00 <br />SONAR Jet of perforations (420 feet, three intervals) 3 LS <br />1 <br />5000 <br />5 000 <br />Under Water video of Well. (after) LS <br />1 <br />1 100 <br />1 1 O0 <br />Demo biliiation�.& pick-up LS <br />1 <br />Proposed new pump: Make: Natlgnal , Model No.: H14MC GPM; .3,000 TOR <br />off:: <br />1. Motor refurbishing includes shop'work, labor and material to perform the following: disassembling; <br />steam cleaning, inspection; replace bearings, heaters, dipping (ono thin layer, baking, reassembling, <br />testing) <br />2.. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment Is applied., the bid price must include cast of the chemicals, chemicals handling.(appiication <br />mixing), used chemicals neutralization and disposal.. <br />3; Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc, (714) 6324003 <br />4. Chemical treatment during wire: brushing will not be used In the evaluation of the bids, If chemical <br />treatment is ,applied, the bidprice must include cost of the chemicals, chemicals 'handling (application <br />mixing), used chemicals neutralization and disposal,. <br />5. Pump base will be. replaced, and attached to.existing discharge pipe, If Welding is deeded, will be:bill at <br />time and material;. <br />6. Concrete around the pump base will have to be removed and. replaced. <br />7. New Stainless Steel line for sounding will be provided. and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />8, Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 28 feet when operating at full -rated load. Soundproofing solution to be <br />approved by the Engineer. <br />151 <br />