1XIIT A
<br />CITY OF S ' ANTA ANA
<br />RYP No,,:1.6.090
<br />WATER WELL,. PU'i1MP AND MOTOR REPAIR SERVtC S
<br />ppendix
<br />ATTAGHMENT:.! sCOPE OF WORK
<br />A, O-etioralOescrtption
<br />The Contractor shall provide waterwell casirg, pump and motor rehabilitation. repair, replacement and related
<br />services foi the City of Santa Ana at various loaatlons within the City. Tha genarsl scope of services is
<br />described below..
<br />B, Work Description
<br />The Contractor shall provide all necesspry super�vtsfon, labor, materials, tools, and equipment to
<br />perform plump pulling and lnstailat€o:rs, water well rehabilitations,, well casing reprai.rs and installations,
<br />water well video inspections,, electric motor repairs, elec,tri.c motor rawInd%n.g.s„ and repair' services
<br />on various types of pumps and, motors, on an as aSs7lg red basis, at various `iocetrons throughout the
<br />City. The :Contractor shall meet with the Water Production project. manager prior to starting any work
<br />at the worksite. Access to the workafts shall be controlled by the Public Works Agency o.cco.rding to
<br />the security standards in place. at that time. The Contractor's services shall include, but are not
<br />necessarily llmltad to,, the fofloWng:
<br />The Contractor shall prrovide transportation for its heavy duty equipment, such as, but not limited to,
<br />drilling rig', pump rig, flatbed truck, doo(n truck, tractor .trailer, as requested by the City to and from
<br />Contracto.r's facility to each Water Production worksite. Alf electric m.ator repair work shall be
<br />transpofled by, the Contractor to, an. IAA, Accredited Mom,ber facility .fQr repair and. returned tc)the City
<br />when, .ropairs are ccrnple:te. :Al water discharged shall be thrbugh ,an NPIDES facility approved .try the
<br />Project Marrapen. It shall be the Contractor's, responsibility to propose a method to disch.a:rge avatar tht:at E
<br />Ni'l�E .:compliant a.r: may frtcf.0 e mefh,pds: such as water dp:ten,fion, f poglh. stir g:� tian�s .nj .n.tYaer
<br />egrfft�rmirt,g strategies.
<br />1. PUMP R�MQVAi,.f.INS.TALLATI.'019 SERVICE
<br />'The Coti.tractor. sh41 be qual€flied tP erforrrt doter weir pUrn.ps re ioval. and 7iristaliadc.n. At ti e."i - f1hl sdtup
<br />for pulling a well;, purin:p,. the Cohtractor'.shall perform Iockoutltagout of the electrical and hydraulic systems,,.
<br />2. WELL. PERFORMANCETESTING SERVICE
<br />The Contractor shalt be qualified to performwell pe.rfQrmance testing. After lritial well parformnce testing
<br />setup, all testing data shall' be 'given tothe City representative upon c€ rrpVion of testing, The
<br />Oontractor shall furnish and install th e development engine temporarily used to power the test pump
<br />process to flushout all sand and small grit out of the area around the well to prevent clogging of the
<br />distribution system: All water discharged shall be through an approved facility approvedby the Project
<br />Manager. The Contractor shall provide tho Project Manager with .its evaluation and recomrhi ndation,
<br />including cost estimates per project. All testing work shall be subject to the Project Manager's written
<br />approval prior to commencing any work by the Contractor, Well performance testing shall be done in
<br />accordance with AWWA Al00Q 97 standards.
<br />3, WATERWORKS PIMP REPAIR SaRV10E
<br />The Contractor small be qu.aVied to repair of one or rr7ore of the following pump units;
<br />
|