My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CLR DESIGN-2017
Clerk
>
Contracts / Agreements
>
C
>
CLR DESIGN-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 8:28:20 AM
Creation date
5/8/2017 3:55:41 PM
Metadata
Fields
Template:
Contracts
Company Name
CLR DESIGN
Contract #
A-2017-060
Agency
Parks, Recreation, & Community Services
Council Approval Date
4/4/2017
Expiration Date
12/31/2017
Insurance Exp Date
7/11/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Plan 2030 <br />LC I UTAH'S HOGLE ZOO J SALT LAKE CITY, UTAH <br />D E S I G N <br />CLIENT <br />Utah Zoological Society <br />CLIENT REFERENCE <br />Craig Dinsmore <br />EXECUTIVE DIRECTOR <br />T 801.582.1635 <br />PROJECTSIZE <br />42 Acres <br />MASTER PLAN COMPLETION <br />2013 <br />DESIGN SERUICB <br />Master Planning <br />KEY PERSONNEL <br />Gregg Leicester, ASL.A, LEED GA <br />PROJECTMANAGER <br />John Collins <br />ARCHITECTURAL DESIGNER & <br />11-LISTRATOR <br />The comprehensive planning effort for Utah's Hogle Zoo Master Plan 2030 <br />commenced with an analysis of the existing zoo campus, with a special focus on <br />identifying the critical programmatic and operational needs,as well as developable <br />land available. The Initial planning process built on the strong framework of <br />exhibits and facilities thatexists today as a result of steady project implementation <br />from 1999 through 2014. Those projects, which were part of the 1999 Master <br />Plan developed by CLR, included the Entry Complex, Elephant Encounter, Asian <br />Highlands, Wildlife Theater, Oasis Plaza, Rocky Shores, the Maintenance and <br />Operations Building, and African Savanna. <br />The focus of the new Master Plan includes increasing animal collection diversity, <br />impactful animal collection planning, improving conservation and education <br />messaging, dynamic experiences for children, consolidated and expanded guest <br />and staff parking zones, and improved guest services and infrastructure to anticipate <br />attendance growth. Located in the foothills of the Wasatch mountain range, the <br />.Zoo's challenging topography requires in depth site analysis to determine the best <br />options for development to improve the visitor circulation system and maximize <br />land use for animal habitats. Key animal attractions proposed include a Diversity <br />of Life & Education Complex, new Great Ape & Primate Forest Habitats, Lighthouse <br />Point Children's Zone, and several strategic facility upgrades. <br />SANTA AINIA LOU I MAS -TER PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.