My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - PARK CUSTODIAL SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
05/16/2017
>
25F - AGMT - PARK CUSTODIAL SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 3:54:30 PM
Creation date
5/11/2017 3:42:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25F
Date
5/16/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.1.20 Stain Removal on Carpet, Upholstery, Partition Panels and Walls -Clean and/or <br />remove all stains as quickly as they are discovered so as not to allow them to set <br />into the fabric. If the stain is a coffee spill, use a contractor- supplied product <br />similar to Interface Coffee Breaker and follow the manufacturer's recommended <br />procedures. Do not blot or attempt to extract. Simply spray the affected area(s). <br />4.1.21 Remove slap tags, graffiti and any other materials used to deface the building and <br />it amenities. <br />4.1.22 Replace burned out lights (at the contractor's expense) Turn off lights once work <br />is completed. <br />4.1.23 "Offices, Stadium Press Box, Closets, Storage Rooms," Restrooms, Showers and <br />Locker Rooms <br />4.2 Weekly Cleaning Schedule <br />4.2.1 Spray and Buffing of Hard Floors -Clean and restore a uniform glass and <br />protective finish to resilient tile or terrazzo floors that are finished with a floor <br />finish. All chairs, trash receptacles, etc., shall be tilted or moved where necessary <br />to spray buff underneath. The entire floor shall have a uniform coating of floor <br />finish. All spray buff solution shall be removed from baseboards, furniture, trash <br />receptacles, etc. <br />4.2.2 Dusting of Ceiling, Atrium Ledges, Lunchroom Drywall Ledges and HVAC Wall <br />Vents -Clean all HAVAC vents and area immediately surround them. Dust all <br />atrium ledges at the glass /wood railing areas and at the atrium stairs. Dust <br />lunchroom drywall edges. Care shall be taken not to spread dust into the air. <br />4.2.3 High Dusting- Remove dust, cobwebs, oily film, etc., from all fixtures and <br />surfaces above 11 feet from the floor surface. This would include lights, grills, <br />light fixtures, pipes, sprinkler systems, cables, ledges, walls, atrium wood and <br />ledges, ceilings, vents, etc. Care shall be taken not to spread dust into the air. <br />4.2.4 Inspect shower curtains, If curtains are worn, the Contractor shall replace them at <br />his own expense with a shower curtain product acceptable to the City's <br />Representative. <br />4.2.5 Clean light fixtures and protective coverings inside and out using approved <br />germicidal cleanser. <br />4.3 Monthly Cleaning Schedule <br />4.3.1 Carpeted Floors -Pile lift carpet floors in all areas. <br />4.3.2 Carpeted Floors — Bi- Monthly* - Spin bonnet all carpeted floors every two (2) <br />months. *(calculate to monthly cost for bidding purposes). January; March; May; <br />July; September and November. <br />4.3.3 Tile Floors -Spray buff all tile floors. 'Clean and resurface floor surfaces using <br />approved products per the manufacturer's specifications. <br />4.3.4 Use pumice stone or other product/tool to remove mineral buildup from around <br />fixtures in the restroom. <br />4.3.5 Pressure -wash all exterior wall and pavement surfaces to remove dirt, gum, dust, <br />debris, stains, etc, to within 50' of the building. <br />4.4 Quarterly Cleaning Schedule <br />25F -15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.