Laserfiche WebLink
5.7.4 Re -soak the mop in the cleaning solution, wring out, and mop the area a second <br />time. <br />5.7.5 When damp mopping the entire floor, change the cleaning solution when it <br />becomes cloudy with dirt. NOTE: Do not mop heavy amounts of cleaning <br />solution onto the floor. <br />5.7.6 If autoscrubbing, use a new white pad. <br />5.7.7 Allow the floor to dry thoroughly before removing "Wet Floor" signs. <br />5.8 Spot Removal <br />5.8.1 Remove heel marks, gum, stains, etc. daily being careful to not damage the floor. <br />Areas affected by removal of marks, gum, stains, etc, shall be refinished <br />following Hillyard's refinishing specifications. <br />6.0 Approved Supplies <br />6.1 Restroom <br />6.1.1 Toilet Tissue - Acclaim White Singlefold Interfolded Bath Tissue # 10101— 00 <br />6.1.2 Scott Bathroom Roll Tissue, item # 05102 20, 4.4 x4.5 inches. <br />6.2 Approved Cleaning Supplies <br />6.2.1 For cleaning urinals and commodes Colossus #1605 <br />6.2.2 For cleaning polished and brushed chrome Sheila Shine <br />6.2.3 Metal/Chrome polish Sheila Shine <br />6.2.4 Disinfectant Versatile #180 <br />7.0 BUILDING SECURITY <br />The Contractor's shall provide the City at the beginning of the agreement a matrix listing the <br />name of his/her custodians, what buildings they will service, what time the buildings will be <br />serviced, what vehicles they drive (make, model and license number). This information will be <br />copied to the Santa Ana Park Rangers and the Santa Ana Police Department for security <br />purposes. <br />The contractor shall keep all exterior doors locked during the performance of work or as <br />otherwise directed and shall ensure that all doors are locked at the end of the shift unless <br />otherwise noted. Offices with security systems shall have them activated immediately after work <br />is completed in that area. The Contractor shall be responsible for any lost keys, card keys and <br />any inherent damages (i.e., re- keying of whole facility). This cost shall be withheld from <br />contractor's payment(s). The decision to re -key the whole facility is solely that of the City's <br />Representative. <br />25F -18 <br />