My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CROSSWALK UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
05/16/2017
>
23A - PROJ - CROSSWALK UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 3:53:16 PM
Creation date
5/11/2017 3:44:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/16/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6831 <br />CROSSWALK UPGRADES - PHASE I <br />FEDERAL PROJECT NO: HSIPL 5063(155) <br />C. The items of work which the bidder made available to DBE firms including, where <br />appropriate, any <br />Breaking down of the contract work items (including those items normally performed by the <br />bidder with its own forces) into economically feasible units to facilitate DBE participation. It <br />is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE <br />participation was made available to DBE firms. <br />Items of Work Bidder Normally Breakdown of Amount Percentage <br />Performs Item Items M Of <br />(YIN) Contract <br />Please see. attached <br />D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the <br />bidder's rejection of the DBEs, the firms selected for that work (please attach copies of <br />quotes from the firms involved), and the price difference for each DBE if the selected <br />firm is not a DBE: <br />Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's <br />rejection of the DBEs: <br />Please see attached <br />Names, addresses and phone numbers of firms selected for the work above: <br />E. Efforts made to assist interested DBEs in obtaining bonding, lines of credit or insurance, <br />and any technical assistance or information related to the plans, specifications and <br />requirements for the work which was provided to DBEs: <br />P -30 of P -40 <br />23A -41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.