My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - CROSSWALK UPGRADES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
05/16/2017
>
23A - PROJ - CROSSWALK UPGRADES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 3:53:16 PM
Creation date
5/11/2017 3:44:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/16/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ARIA <br />PROPOSAL <br />PROJECT NO.: 15-6831 <br />CROSSWALK UPGRADES - PHASE I <br />FEDERAL PROJECT NO: HSIPL 5063(155) <br />28 <br />INSTALL 4'x2' TRUNCATED DOME <br />2 <br />EA <br />$ 500.00 <br />$ 1,000.00 <br />29 <br />REMOVE AND DISCARD EXISTING POLE, SIGNAGE <br />2 <br />EA <br />$ 2,400.00 <br />$ 4,800.00 <br />& EQUIPMENT <br />_ <br />30 <br />REMOVE AND SALVAGE EXISTING FLASHING <br />6 <br />EA <br />$ 500.00 <br />_ <br />$ 3,000.00 <br />LIGHTS AND SOLAR PANEL FROM 1 -A POLE <br />31 <br />REMOVE AND SALVAGE EXISTING EQUIPMENT ON <br />4 <br />EA <br />$ 400.00 <br />$ 1,600.00 <br />STEEL POST (CABINET, SOLAR PANEL) <br />32 <br />UNCLASSIFIED EXCAVATION* <br />30 <br />Cy <br />$ 270,00 <br />$ 8,100.00 <br />33 <br />AC PAVEMENT* <br />10 <br />TN <br />$ 490.00 <br />$ 4,900.00 <br />34 <br />PCC CURB RAMP* <br />400 <br />SF <br />$ 25.00 <br />$ 10,000.00 <br />35 <br />PCC SIDEWALK (4 ")* <br />700 <br />SF <br />$ 6.00 <br />4,200.00 <br />36 <br />PCC CURB AND GUTTER* <br />200 <br />LF <br />$ 31.00 <br />$ 6,200.00 <br />(TYPE A -2 -8) <br />37 <br />PCC CURB * <br />100 <br />LF <br />$ 16.00 <br />$ 1,600.00 <br />(TYPE B -1) <br />38 <br />ADJUST WATER VALVE FRAME AND COVER TO <br />1 <br />EA <br />$ <br />$ 375.00 <br />FINISHED GRADE <br />375.00 <br />39 <br />BIORETENTION AREA* <br />726 <br />SF <br />$ 7.00 <br />$ 5,082.00 <br />40 <br />FURNISH AND INSTALL ORGANIC SOIL* <br />81 <br />Cy <br />$ 43.00 <br />$ 3,483.00 <br />i <br />TOTAL BASE BID $ 222,050.00 <br />23A -9 <br />P -3 of 13-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.