My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - RFQ ENVIRONMENTAL AND PLANNING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/06/2017
>
19C - RFQ ENVIRONMENTAL AND PLANNING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2017 3:27:35 PM
Creation date
6/1/2017 3:10:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
19C
Date
6/6/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. It should be noted that multiple firms may be selected to provide services and there is <br />no guarantee of work. The City reserves the right to select consultants in any manner <br />that will best serve the City's interests. <br />E. At such time when the consultant's services are required, staff will forward a request <br />for services, including a project description, any pertinent supporting information and <br />technical studies, and copies of the proposed application and plans (as available). <br />The consultant may be requested to provide additional services such as the <br />preparation of supporting technical reports and studies for the project application or a <br />peer review of applicant -submitted materials. The consultant will evaluate the <br />proposal and in turn provide a Scope of Work and Cost Estimate for services. <br />F. Firms will be selected based upon their ability to perform the required work within <br />each project's schedule and budget constraints. All work prepared by the consultant <br />will be performed for and at the direction of the City of Santa Ana. <br />G. When appropriate, the City will furnish information in its possession relevant to <br />preparation of the environmental documentation, including the General Plan and <br />Zoning Code. <br />H. The Consultant shall be responsible for retaining data, records and documentation for <br />the preparation of the environmental documents. These materials shall be made <br />available at the request of the City. <br />I. All data, documents and other products used or developed during preparation of the <br />environmental documentation will become property of the City. <br />The City reserves the right to reject and replace any and all subcontractors, and <br />reserves the right to approve all subcontractors. <br />K. Progress review meetings for each assigned project shall be held at intervals deemed <br />appropriate by the City. <br />COORDINATION <br />Coordination with the City, other consultants and agencies will be required to achieve <br />satisfactory and timely delivery of the final work product. Coordination may include, but <br />not be limited to; coordination with applicant/developer, neighborhood and civic groups, <br />other local agencies and consultants, County of Orange, Airport Land Use Commission, <br />State Agencies and Boards, Federal Aviation Administration, and Environmental <br />Protection Agency. <br />The City will decide the manner in which the coordination efforts with be conducted. At <br />the City's option, coordination efforts may be performed by the Consultant's direct <br />contact, by the Consultant acting through the City or by the City only. When coordination <br />efforts require agreements, such agreements shall be coordinated through the City. <br />19C-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.