My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO MEASURE M PRGM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/06/2017
>
55B - RESO MEASURE M PRGM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2017 3:35:12 PM
Creation date
6/1/2017 3:12:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
6/6/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. System Improvements: <br />In addition to the corridor synchronization, improvements to the traffic signal system, <br />communication and monitoring infrastructure were made to allow the City to better monitor <br />traffic condition, manage traffic signals and maintain the synchronization. <br />MacArthur Blvd Corridor: Upgraded traffic signal communication to IP addressing, <br />installed fiber optic and wireless communication links, installed/upgraded CCN at 4 <br />locations and installed Blufax travel time system at 3 locations. <br />2. 1s` St Corridor: Upgraded traffic signal communication to IP addressing, installed fiber <br />optic and wireless communication links, installed/upgraded CCTV at 5 locations, <br />installed system detection at 5 locations and replaced traffic signal cabinets at <br />Sycamore and Bush. Installed Blufax travel time system at 4 locations. <br />3. Edinger Ave Corridor: Upgraded traffic signal communication to IP addressing, <br />installed fiber optic and wireless communication links, installed/upgraded CCN at 4 <br />locations, installed system detection at 3 locations and replaced traffic signal cabinets <br />at 3 locations. Installed Blufax travel time system at 4 locations. <br />4. Grand Ave Corridor: Upgraded traffic signal communication to IP addressing, installed <br />fiber optic and wireless communication links, installed/upgraded CCN at 7 locations, <br />installed system detection at 6 locations, replaced traffic signal cabinets at 4 locations. <br />Installed new communication HUB at McFadden Ave. Installed Blufax travel time <br />system at 5 locations. Upgraded video management system at the TMC. <br />5. Harbor Blvd Corridor: Upgraded traffic signal communication to IP addressing, <br />installed fiber optic and wireless communication links, installed/upgraded CCN at 4 <br />locations, installed system detection at 3 locations, installed Blufax travel time system <br />at 3 locations, and installed new communication HUB at 5"' St. Upgraded video wall <br />display at the TMC. <br />6. Bristol St Corridor: Currently under construction will upgrade traffic signal <br />communication to IP addressing, install fiber optic and wireless communication links, <br />install/upgrade CCTV at 6 locations, install system detection at Segerstrom Ave, <br />replace traffic signal cabinets at 7 locations and install Blufax travel time system at 4 <br />locations. Provide additional video licenses and upgrade motorist information system <br />at the TMC. <br />APPENDICES <br />Appendix 1: Traffic Signal Inventory <br />Appendix 2: Three -Year Capital, Operations & Maintenance Budget <br />558218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.