Laserfiche WebLink
EXHIBIT 2 <br />RESOLUTION 2017 -XXX <br />3.36% <br />PROPOSED <br />REVENUE <br />FY 16-17 <br />FY 17-18 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />53601 <br />53602 <br />53603 <br />53600 <br />121) Code Modification - complex <br />flat <br />3,302.63 <br />3413.60 <br />53601 <br />53602 <br />53603 <br />53600 <br />122) Notice of Violation -Structural Plan Check New <br />hourly <br />206.91 <br />213.86 <br />51601 <br />123) Permit Issuance Fee - EMP and Misc. Building <br />flat <br />51.26 <br />52.98 <br />51602 <br />51603 <br />51604 <br />51601 <br />124) Permit Issuance Fee - Residential and Non Residential <br />flat <br />136.72 <br />141.32 <br />51600 <br />125) Permit Issuance Fee - General Plan Update surcharge <br />flat <br />20.56 <br />21.25 <br />51601 <br />126) Permit Renewal/Extension Fee <br />flat <br />74.63 <br />77.13 <br />51602 <br />(per permit renewed or extended) <br />51603 <br />51604 <br />51601 <br />127) Residential Rooftop Solar (1kW to 15kW) <br />flat <br />500.00 <br />500.00 <br />Plus each additionl kW over 15kW <br />each <br />15.00 <br />15.50 <br />Commercial Rooftop Solar (1kW to SOkW) <br />flat <br />1,000.00 <br />1033.60 <br />Plus each additional kW over 50kW up to 250 kW <br />each <br />7.00 <br />7.24 <br />Commercial Rooftop Solar (over 250 kW) <br />flat <br />2,400.00 <br />2480.64 <br />Plus each additional kW over 250kW <br />each <br />5.00 <br />5.17 <br />53600 <br />128) Solar Panel -Structural Plan Check <br />hourly <br />206.91 <br />213.86 <br />51601 <br />129) Solar Panel - Inspection Residential <br />flat <br />304.80 <br />315.04 <br />51601 <br />130) Solar Panel - Inspection Commercial <br />flat <br />918.51 <br />949.37 <br />51601 <br />131) Field Plan Check -subject to field Structural Plan Check <br />- hourly <br />149.26 <br />154.27 <br />53600 <br />132) Cell Tower - Structural Plan Check <br />hourly <br />206.91 <br />213.86 <br />53600 <br />133) Deferred Submittal -Structural Plan Check <br />hourly <br />206.91 <br />213.86 <br />53600 <br />134) Rooftop equipment -Structural Plan Check <br />hourly <br />206.91 <br />213.86 <br />53600 <br />135) Equipment Changeout- Structural Plan Check <br />hourly, min 1/2 hr <br />206.91 <br />213.86 <br />75A-1-45 36 <br />