My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A-2 - PH - 2017-2018 BUDGET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/06/2017
>
75A-2 - PH - 2017-2018 BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2017 5:16:14 PM
Creation date
6/1/2017 5:03:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A-2
Date
6/6/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS AGENCY - Continued <br />5. Fire Flow Test Application Fee <br />Existing Fee: None <br />Proposed Fee: $24.46 <br />This fee is to recover costs for an Assistant Engineer II to gather pertinent data for performing a <br />witnessed fire flow test. These tests are required of certain development projects by the Orange <br />County Fire Authority. Per revisions in the Santa Ana Municipal Code (SAMC), this fee will now be as <br />set in the Schedule of Miscellaneous Fees. Department anticipates $978 in fees annually. <br />6. Fire Flow Test Witness Fee <br />Existing Fee: None <br />Proposed Fee: $114.75 <br />This fee covers in full staff time in witnessing the fire flow test performed by a 3rd party in the field. <br />Orange County Fire Authority requires these tests of certain development projects. Due to revisions <br />in the Santa Ana Municipal Code (SAMC), this fee will now be as set in the Schedule of <br />Miscellaneous Fees. $4,590 in fees is anticipated for FY 17-18. <br />7. Water Service Anolication Fee <br />Existing Fee: None <br />Proposed Fee: $24.46 <br />This application fee recovers staff time gathering and processing pertinent data for the installation of <br />a water meter as requested by customers. Per revisions in the Santa Ana Municipal Code (SAMC), <br />this fee will now be as set in the Schedule of Miscellaneous Fees. Water Enterprise anticipates <br />$1,468 in fees for FY 17-18. <br />8. Construction Meter Daily Rental CharEe <br />Existing Fee: None <br />Proposed Fee: $2.00 per day <br />This charge is based on the cost of the equipment to be located at a construction site. This fee has <br />been charged and collected per Santa Ana Municipal Code (SAMC) in the past, however due to <br />revisions in the code, this charge will now be as set in the Miscellaneous Fees Schedule. <br />22 <br />75A-2-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.