Laserfiche WebLink
« 1'*,1 € <br />PROFESSIONAL. FETE <br />This proposal includes fees and expenses for the conversion of Amazon's Edge to new Giant River Otter Exhibit phase (Tasks 1 - 5 <br />as outlined in our proposal submitted August 22, 2016.) <br />CLR will carry -out the work described in the proposal of August 22, 2016 for the Lump Sum Professional Fee of Two Hundred <br />Ninty-Six Thousand Nine Hundred and Twenty Dollars ($296,920) as detailed in the Fee Breakdown chart below. <br />Reimbursable expenses are in addition to the Professional Fee and represent the cost of travel (air/ground), long distance <br />communication, reproduction (plotting, printing, digital imaging), mailing, etc. Reimbursable expenses are billed at cost and are <br />estimated (not an upset limit) to be Sixteen Thousand Seven Hundred and Seventy -Five Dollars ($16,775). <br />FEE BREAKDOWN <br />Firm <br />Task 1 <br />Task2 <br />Task3 <br />Task <br />Task <br />SubTotal <br />CLR Design <br />Architecture, Exhibit Design, <br />$14,500 <br />$27,500 <br />$34,750 <br />$45,750 <br />$29,750 <br />$152,250 <br />Project Management <br />KPFF <br />Civil Engineering <br />$740 <br />$1,500 <br />$4,880 <br />$7,600 <br />$3,720 <br />$18,440 <br />KPFF <br />Structural Engineering <br />$1,000 <br />$1,700 <br />$7,500 <br />$10,800 <br />$7,500 <br />$28,500 <br />S&K <br />Mechanical Plumbing Engineering <br />$700 <br />$2,300 <br />$4,000 <br />$5,500 <br />$3,500 <br />$16,000 <br />S&K <br />Electrical Engineering <br />$500 <br />$1,500 <br />$4,000 <br />$5,000 <br />$3,500 <br />$14,500 <br />Tip <br />uSEngineeriag <br />$2,000 <br />$8,070 <br />$14,500 <br />$21,000 <br />$101800 <br />$56,370 <br />Subtotal Design <br />$19,440 <br />$42,570 <br />$69,630 <br />$95,650 <br />$58,770 <br />$286,060 <br />KPJ Consulting <br />$500 <br />$2,000 <br />$2,D00 <br />$1,500 <br />$0 <br />$6,000 <br />Cost Estimating <br />Karl Kranz <br />HusbandryExpert <br />$1000 <br />$1,500 <br />$750 <br />$750 <br />$0 <br />$4,000 <br />CDA <br />CA5P <br />$0 <br />$0 <br />$0 <br />$860 <br />$0 <br />$860 <br />Subtotal Survey & Specialty <br />$1,500 <br />$3,500 <br />$2,750 <br />$3,110 <br />$0 <br />$10,860 <br />TOTAL FEES <br />$20,940 <br />$46,070 <br />$72,380 <br />$98,760 <br />$58,770 <br />$296,920 <br />Estimated Expenses <br />$1,475 <br />$3,650 <br />$4,450 <br />F $3,250 <br />$31950 <br />$16,775 <br />t 215.564,0250 • f 215.564.1154 • www,clr osign.mm • 833 chestnut street, suite 1000 philadelphia, pa 19107 <br />3295 laguna canyon road, suite c laguna beach, ca 92651 <br />