« 1'*,1 €
<br />PROFESSIONAL. FETE
<br />This proposal includes fees and expenses for the conversion of Amazon's Edge to new Giant River Otter Exhibit phase (Tasks 1 - 5
<br />as outlined in our proposal submitted August 22, 2016.)
<br />CLR will carry -out the work described in the proposal of August 22, 2016 for the Lump Sum Professional Fee of Two Hundred
<br />Ninty-Six Thousand Nine Hundred and Twenty Dollars ($296,920) as detailed in the Fee Breakdown chart below.
<br />Reimbursable expenses are in addition to the Professional Fee and represent the cost of travel (air/ground), long distance
<br />communication, reproduction (plotting, printing, digital imaging), mailing, etc. Reimbursable expenses are billed at cost and are
<br />estimated (not an upset limit) to be Sixteen Thousand Seven Hundred and Seventy -Five Dollars ($16,775).
<br />FEE BREAKDOWN
<br />Firm
<br />Task 1
<br />Task2
<br />Task3
<br />Task
<br />Task
<br />SubTotal
<br />CLR Design
<br />Architecture, Exhibit Design,
<br />$14,500
<br />$27,500
<br />$34,750
<br />$45,750
<br />$29,750
<br />$152,250
<br />Project Management
<br />KPFF
<br />Civil Engineering
<br />$740
<br />$1,500
<br />$4,880
<br />$7,600
<br />$3,720
<br />$18,440
<br />KPFF
<br />Structural Engineering
<br />$1,000
<br />$1,700
<br />$7,500
<br />$10,800
<br />$7,500
<br />$28,500
<br />S&K
<br />Mechanical Plumbing Engineering
<br />$700
<br />$2,300
<br />$4,000
<br />$5,500
<br />$3,500
<br />$16,000
<br />S&K
<br />Electrical Engineering
<br />$500
<br />$1,500
<br />$4,000
<br />$5,000
<br />$3,500
<br />$14,500
<br />Tip
<br />uSEngineeriag
<br />$2,000
<br />$8,070
<br />$14,500
<br />$21,000
<br />$101800
<br />$56,370
<br />Subtotal Design
<br />$19,440
<br />$42,570
<br />$69,630
<br />$95,650
<br />$58,770
<br />$286,060
<br />KPJ Consulting
<br />$500
<br />$2,000
<br />$2,D00
<br />$1,500
<br />$0
<br />$6,000
<br />Cost Estimating
<br />Karl Kranz
<br />HusbandryExpert
<br />$1000
<br />$1,500
<br />$750
<br />$750
<br />$0
<br />$4,000
<br />CDA
<br />CA5P
<br />$0
<br />$0
<br />$0
<br />$860
<br />$0
<br />$860
<br />Subtotal Survey & Specialty
<br />$1,500
<br />$3,500
<br />$2,750
<br />$3,110
<br />$0
<br />$10,860
<br />TOTAL FEES
<br />$20,940
<br />$46,070
<br />$72,380
<br />$98,760
<br />$58,770
<br />$296,920
<br />Estimated Expenses
<br />$1,475
<br />$3,650
<br />$4,450
<br />F $3,250
<br />$31950
<br />$16,775
<br />t 215.564,0250 • f 215.564.1154 • www,clr osign.mm • 833 chestnut street, suite 1000 philadelphia, pa 19107
<br />3295 laguna canyon road, suite c laguna beach, ca 92651
<br />
|