My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT SPACE PLANNING AND IMPLEMENTATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
25H - AGMT SPACE PLANNING AND IMPLEMENTATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:46:21 AM
Creation date
6/15/2017 4:26:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25H
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 30, 2017 <br />RFP NO.: 17-057 <br />Statement of Qualifications: <br />We at Culver Newlin have assembled this proposal based on the information in the bid package. <br />The space planning and furniture has been laid out to best maximize the office areas for your <br />employees. For the construction aspect of this project, Tim Marquis of Marquis Construction, <br />Inc., will need to meet with each department to ensure layouts and expectations are covered. <br />The construction pricing is separate from the furniture for insurance and legal specifications and <br />will require their own purchase order. All other areas are covered. <br />Culver Newlin/McMahan Business Interiors has Lee -Ann Harvey as the lead on this project and <br />she will be coordinating with Margaret Mercer the time frames and expectations for installs and <br />completion of the project from day one. Lee -Ann has been in the commercial furniture industry <br />for 18 years and excels in all areas of the job. She has had extensive experience with local city <br />and government agencies including many projects with your city as well as Costa Mesa, <br />Newport Beach, Newport Police Department, OC Sheriffs and OC Probation Department. The <br />installer for the furniture is First Choice out of Costa Mesa. They will be working with Lee -Ann <br />to ensure a smooth and hassle free install. They have worked with Lee -Ann on a majority of her <br />projects and are highly professional and efficient. For the construction side, Tim Marquis of <br />Marquis Construction Inc., will be coordinating those aspects of the project. Marquis <br />Construction has handled Lee -Ann's construction projects at the City of Costa Mesa, Newport <br />Beach and Newport Police Department and does a thorough job. <br />If awarded this project, our scope of work will start with another job walk to confirm <br />measurements and assess needs for the different areas and sites. Architectural drawings will <br />need to be done to ensure construction work, sprinklers, HVAC, electrical, data/phone drops, <br />etc. will be done correctly through Marquis Construction Inc. Permits will then need to be pulled <br />prior to work being started. All aspects of construction and furniture teardowns and installs will <br />be scheduled ahead of time to allow for staff to be relocated as needed. Communication will be <br />key between the contractor, Lee -Ann and the City to ensure a smooth transition. Construction <br />will take about 6 weeks to complete and the furniture lead time is 5-6 <br />520 E. Rincon St, Ste 102. Corona, CA. 92879 949-579-0123 <br />25H-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.