Laserfiche WebLink
City of Santa Ana <br />Tetra Tech will prepare 60% design plans, <br />specifications and estimate of probable costs <br />(PS&E's) in accordance with the approved <br />criteria as outlined in the Final Basis of Design as <br />prepared in Task 10 above. The 60% PS&E's shall <br />be prepared using current City Standards, other <br />agency standards where applicable, and good <br />engineering practice. The 60% PS&E's shall be <br />submitted to the City for review. Other agencies' <br />review may be required if noted in the Final Basis <br />of Design Report. Two (2) hard copies of full size <br />(36x24) plan sets, four (4) hard copies of half size <br />(11x17) plan sets and one (1) electronic pdf copy <br />of the 50% PS&E's to the Project Manager. All <br />electronic CAD files must be in the MicroStation v8i <br />format or compatible. <br />The 60% PS&E submittal should include plans <br />of all disciplines for the proposed storm drain <br />improvements and for the pump station capacity <br />improvements Including all civil, mechanical, <br />electrical, geotechnical, structural, and any other <br />design required, overall outline of the specifications <br />with some detail included and an engineer's <br />estimate of probable costs with preliminary <br />quantities and unit costs. The 60% PS&E submittal <br />shall also include 60% drawings and specifications <br />related to system integration for the City SCADA <br />network as described in Task 8 below. The 60% <br />PS&E submittal shall also include a proposed <br />blending plan for review and submittal to the State <br />Water Resources Control Board, Drinking Water <br />Division. <br />We envision the construction drawings will include <br />the following: <br />Title Sheet <br />General Notes <br />N Horizontal Control Plan <br />19 Well 32 Demolition Plan <br />Well 32 Site Plan and Grading Plan <br />Well 32 Site Details <br />Well 32 Yard Piping Plan <br />to Well 32 Drain Line Profile <br />Well 32 Discharge Pipeline Plan and Profile (3 <br />sheets/40 scale) <br />IM Well Mechanical Plan and Section <br />Well Details <br />to John Garthe Piping Connection and Fiber Optic <br />Line Alignment <br />Piping and Miscellaneous Details (2 sheets) <br />Is Sodium Hypochlorite Generation Schematic and <br />Details <br />Sodium Hypochlorite Mechanical Piping Plan <br />and Sections <br />Is General Structural Notes <br />• Structural Observation Notes <br />• Well 32 Exterior Elevations <br />• Well 32 Structural Foundation Plan <br />• Well 32 Structural Roof Framing Plan <br />• Well 32 Structural Section <br />• Structural Details (4 sheets) <br />• Sodium Hypochlorite Building Exterior <br />Elevations, Floor and Roof Framing Plan <br />• Sodium Hypochlorite Building Structural Section <br />and Details <br />• General Electrical Notes and Symbols <br />• Well 32 Electrical Site Plan <br />• Well 32 Electrical Single Line Diagram, MCC <br />Elevations and Conduit Schedules <br />• Well 32 Power Plan <br />Is Well 32 Lighting Plan <br />Sodium Hypochlorite Power Plan <br />IN Well 32 Block Diagram (2 sheets) <br />Well 32 Loop Diagram (2 sheets) <br />251-24 <br />