My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT HVAC AIR-HANDLING SYSTEMS REPLACEMENT AT SNA REG TRANS CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
25L - AGMT HVAC AIR-HANDLING SYSTEMS REPLACEMENT AT SNA REG TRANS CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:49:34 AM
Creation date
6/15/2017 4:27:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The existing Siemens EMS control points for all equipment relevant to this project shall <br />be maintained and verified when construction is completed. <br />• A new on/off status control point(s) shall be incorporated into the existing Siemens EMS <br />for the new VFD control. <br />• Additional Siemens control points are to be determined by the City. <br />New Controls System — Pricing to be provided by Contractor as Option D <br />Contractor is to provide this pricing as incremental cost, hi other words, the cost beyond Base <br />Option. <br />• The Contractor is to provide equipment that is compatible with DEC Siemens <br />management system (Insight or newer) <br />• Replace the fan coil controllers on remaining (20) units with new DDC controllers that <br />were not covered in the Base Option. The quantity of (20) remaining fan coils is to be <br />verified by the Contractor <br />• The Contractor will furnish new DDC chilled water valves and DDC heating hot water <br />controls valves for remaining (20) fan coil units that were not covered in the Base Option. <br />• The Contractor will furnish new DDC zone temperature sensors for units <br />• The Contractor will upgrade the existing Siemens controller (or provide new, as needed) <br />and upgrade graphics and programming, as needed <br />• Contractor to provide water balancing report to City <br />• System startup and commissioning <br />• The new controls system will integrate All HVAC building systems, including all fan coil <br />units, chiller, chilled water pumps, heat rejection equipment, etc. <br />,Additional (2) Fan Coil Replacement — Pricing to be provided by Contractor as Option E <br />Contractor is to provide this pricing as incremental cost. In other words, the cost beyond Base <br />Option. <br />• Contractor to replace (2) additional fan coil units, #16 and #18 which serve suite 103. <br />• These additional (2) fan coil units are to be installed in accordance to all scope items for <br />the fan coils identified in the Base Option. <br />City of <br />
The URL can be used to link to this page
Your browser does not support the video tag.