My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT HVAC AIR-HANDLING SYSTEMS REPLACEMENT AT SNA REG TRANS CENTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
25L - AGMT HVAC AIR-HANDLING SYSTEMS REPLACEMENT AT SNA REG TRANS CENTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:49:34 AM
Creation date
6/15/2017 4:27:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25L
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Michele Martinez <br />COUNCILMEMBERS <br />P. David Benavides <br />Vicente Sarmiento <br />Jose Solorio <br />Sal Tinajero <br />Juan Villages <br />May 18, 2017 <br />ADDENDUM No. 3 <br />CITY OF SANTA ANA <br />20 Civic Center Plaza a P.O. Box 1988 <br />Santa Ana, California 92702 <br />www.santa-ana oro <br />SUBJECT: RFP #17-056 — Requests for Information <br />INTERIM CITY MANAGER <br />Cynthia J. Kurtz <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Marla D, Hulzar <br />The following changes have been made to the above referenced Request for Proposals. <br />1. Cover Page, Key RFP Dates: Delete Letter of Intent requirement. <br />2. Cover Page, Key RFP Dates: Deadline for Requests for Information to read as follows: <br />Deadline for Requests for Information: May 26, 2017 at noon. <br />3. Page Al -2, Section: Description of Work: Fan Coil Unit Replacement — Bullet 8 Revise <br />to read as follows: Install new hot water and chilled water piping to coils as needed from <br />new isolation full port ball valves, including petes plugs on supply and return lines, and <br />hose bib on supply piping at coil. Contractor is responsible to insulate all new piping and <br />piping devices. <br />4. Page A1-1, Section: Description of Work: Fan Coil Unit Replacement — Bullet 19 Revise <br />read as follows: This applies to units: 2,3,4,5,6,7,8,10,11, and 12. <br />5. Page A1-2, Section: Description of Work: Fan Coil Unit Replacement — Bullet 20 Revise <br />to read as follows: All appropriate sealing and fire Caulking per code is the responsibility <br />of the contractor. <br />6. Page A1-2, Section: Description of Work: Fan Coil Unit Replacement — Add Bullet 25 to <br />read as follows: Contractor is responsible to install access panels where needed, for <br />removal or installation of units, including painting and patching, as needed. <br />7. Page A1-2, Section: Description of Work: Fan Coil Unit Replacement —Add Bullet 26 to <br />read as follows: Install new Siemens zone controls (DDC) for heating and cooling <br />valves, including new thermostats that are Title 24 compliant, and Auto -Demand <br />Response control enabled, see Auto -DR section below. <br />8. Page Al -2, Section: Description of Work: Fan Coil Unit Replacement — Add Bullet 27 to <br />read as follows: All new controls will be Siemens and integrated into existing building <br />controls. <br />SANTA ANA CITY COUNCIL <br />Pulido Michele Martinoz Nicene Sarmiento Jose Solorio P. David aonavldes Juan <br />iIv llooas(o)aVainllelo as n <br />e or sti 'S21 Tnor Mayor Pro Tom, Ward 2 Ward 1 Ward 3 and 4 WertlS <br />ta-ena.ormartinez®sena-ane orvsarmiettansaraanao'sc b a WardG <br />ea s 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.