My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65B - INITIATION OF NEW SOLID WASTE SRVS CONTRACT PROCESS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
65B - INITIATION OF NEW SOLID WASTE SRVS CONTRACT PROCESS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:51:44 AM
Creation date
6/15/2017 4:27:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
65B
Date
6/20/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
room temperature with a cycle time that simulates lift, dump and return of 6 <br />seconds. Carts shall remain watertight and functional beyond 6,000 cycles. Test <br />loads are as follows: <br />Size A: 160 lbs. distributed <br />Size B: 250 lbs. distributed <br />Size C: 350 lbs. distributed <br />7.3 Wheel/Axle Test - shall verify the combined durability of the wheels, axle and <br />cart axle supports under fully loaded conditions. The two cycle tests shall be <br />performed at room temperature as follows: <br />Cycle 1 - with a rolling length of 75 feet and a 5" curb drop. Cart shall continue to <br />roll freely and be watertight after 1,000 drops. <br />Cycle 2 - repeated with a 5.5" stair drop. Cart shall continue to roll freely and be <br />watertight after 1,000 drops. <br />Test loads shall be as follows: <br />Size A: <br />125 lbs. distributed <br />Size B: <br />200 lbs. distributed <br />Size C: <br />350 lbs. distributed <br />7.4 Salt Spray - ASTM B 117-90 corrosion tests shall be applied to the lift bracket for <br />a minimum of 96 hours and to the axle for a minimum of 500 hours. Bracket and <br />axle shall remain corrosion free. <br />8. Serial Number/Manufacture Date: Each cart shall be hot stamped with a seven digit, 1- <br />1/2" high alpha/numeric identification number on the front of the cart. An in -molded <br />year/month date wheel identification will be located on the bottom of the cart. <br />9. Markings: Each cart lid shall be clearly and permanently marked with the cart's size or <br />volume capacity. <br />9.1 Precautionary instructions shall be molded into the lids in English and Spanish as <br />follows: <br />Size A: Cart Capacity 35 Gallons <br />Do not overload or you may have difficulty controlling the cart. <br />Do not roll cart with lid open. <br />Do not put sand, soil, rocks or concrete in cart. <br />Maximum load 125 pounds. <br />Do not put anything hot such as ashes in the cart. <br />Do not put paints, solvents, gasoline, oil, etc. in cart. <br />MR, <br />
The URL can be used to link to this page
Your browser does not support the video tag.