My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:43:00 AM
Creation date
6/15/2017 4:28:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/20/2017
Destruction Year
2022
Document Relationships
LOS ANGELES ENGINEERING, INC.,
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM ONE <br />PROPOSAL <br />PROJECT NO. 11-6740: BRISTOL S'T'REET IMPROVEMENTS AND WIDENING FROM <br />WASHINGTON AVENUE TO 17"" STREET <br />PROJECT NO. 17-6472: BRISTOL STREET WATER MAID IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17"r STREET <br />PROJECT NO. 17-6473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />12. <br />Cross -Gutter (Arterial Street) <br />2,000 <br />SF <br />$ <br />$ <br />l,;?, <br />/ z <br />13. <br />Concrete Bus Pad <br />2,400 <br />SF <br />$ <br />$ <br />14. <br />PCC Protected Bike Lane (6") <br />1,800 <br />LF <br />$ <br />31 <br />$ <br />0 ow <br />15. <br />Decorative PCC Plaza <br />1,700 <br />SF <br />$ <br />$ <br />�2-7aoo <br />16. <br />PCC Bile Lane at Driveways (8") <br />3,100 <br />SF <br />$ <br />$ <br />sX <br />17. <br />Adjust Manhole Frame and Cover to Finished <br />12 <br />EA <br />S <br />$ <br />Grade <br />!oma' <br />2i <br />18. <br />Furnish and Install New Water Valve Frame <br />12 <br />EA <br />$ <br />$ <br />,aid Cover <br />q0b- <br />14goo <br />19. <br />Adjust Sewer and Drainage Manhole to <br />23 <br />EA <br />$ <br />$ <br />Finished Grade'�.,.- <br />20. <br />Landscaping <br />l <br />LS <br />$ <br />$ <br />7b0 qC1 <br />� TPOGC� <br />21. <br />ILrigation <br />1 <br />LS <br />$ <br />$ <br />-0334)m <br />23.3 660 <br />22. <br />I -Year Landscaping Maintenance Period <br />1 <br />LS <br />$ <br />$ <br />23. <br />Construction Signs <br />4 <br />EA <br />$ <br />$ <br />_, <br />24. <br />Three 4" conduit on west side of Bristol <br />1,500 <br />LF <br />$ , <br />$ <br />25. <br />Stamped Concrete at Median Island <br />100 <br />SF <br />$ <br />$ <br />/00- <br />/vppp.. <br />26. <br />Trench, Shoring and Plating <br />1 <br />LS <br />$ <br />$ <br />27. <br />12" Reinforced Concrete Pipe (2500-D) per <br />6 <br />LF <br />$ <br />$ <br />City Standard Plan I150J <br />l TCO' <br />28. <br />18" Reinforced Concrete Pipe (2500-D) per <br />249 <br />LF <br />$ <br />$ <br />City Standard Plan 1150- <br />li17� <br />29. <br />30" Reinforced Concrete Pipe (2500-D) per <br />862 <br />LF <br />$ <br />$ <br />City Standard Plan 1150 <br />og,�q J - <br /><;i 3 ei,5 0 <br />30, <br />Reinforced Concrete Collar (D=12") per City <br />1 <br />EA <br />$ <br />$ <br />Standard Plan 320 <br />"' <br />4j' — <br />P-2 of P-22 <br />23A-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.