My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:43:00 AM
Creation date
6/15/2017 4:28:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/20/2017
Destruction Year
2022
Document Relationships
LOS ANGELES ENGINEERING, INC.,
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF MANTA ANA ADDENDUM ONE <br />PROPOSAL <br />PROJECTNO. 11-6740: BRISTOL STREET IMPROVEMENTS AND WIDENING FROM <br />WASHINGTON AVENUE TO 17T"STREET <br />PROJECT NO. 17-6472: BRISTOL STREET WATER MAIN IMPROVEMENT'S FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECT NO. 17-61473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17Tu STREET <br />TOTAL BASE BID <br />$ 4S 7 4-11b <br />TOTAL ADD ALTERNATE A BID <br />$ 1 C)OO <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only, This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used; and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />'i This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 190 working days (not including the one-year landscape maintenance <br />period) after the commencement date stated in the Notice to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $3,500 per calendar day. <br />Name of Firm <br />Signature of BIDDER <br />Title Aaron O'Brien, Secretary <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />Los Angeles Engineering, Inc. - Corporation <br />Angus O'Brien - President <br />Aaron O'Brien - Secretary <br />Beth Ballard CFO <br />P-8 of P-22 <br />23A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.