My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
06/20/2017
>
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 8:43:00 AM
Creation date
6/15/2017 4:28:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
6/20/2017
Destruction Year
2022
Document Relationships
LOS ANGELES ENGINEERING, INC.,
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pultdo <br />MAYOR PRO TEM <br />Michele Martinez <br />COUNCILMEMBERS <br />P, Oavld Benavides <br />VMoonta 5arrniento <br />Jose Solorlo <br />Sal Tinajera <br />Juan Villegas <br />May 4, 2017 <br />ADDENDUM ONE <br />CITY OF SANTA ANA <br />20 Civic Center Plaza + P.O. Box 1998 <br />Santa Ana, California 92702 <br />VWm aanta-ATIA.0rfl <br />EXHIBIT 2 <br />ACTINO CITY MANAGER <br />Gerardo Mouet <br />CITY ATTORNEY <br />Sonia R, Carvalho <br />CLERK OP THE COUNCIL <br />Maria 0. Hutmr <br />SUBJECT: 1111-6740,17-6472,17-6473: BRISTOL ST WIDENING, WATER MAIN, AND <br />SEWER MAIN IMPROVEMENTS FROM WASHINGTON AVE TO 17TH ST <br />The following changeslolarifications have been made to the SPECIFICATIONS of the subject <br />project: <br />1. BID PROPOSAL.; Pages P-1 to P-7 <br />REPLACE with: <br />Revised BID PROPOSAL; Pages P•1 to P•8 (attached) <br />Description of changes: <br />Reduced Quantity of "8' High Sound Wall (including footing) <br />Added bid items 86a, 96a, 96b and 102 <br />Changed Quantity of bid item 93 from 1 t0 2 <br />Added "ADD Alternate A" to Bid Proposal <br />Revised Working Days <br />Revised Liquidated Damages <br />2, SECTION 3,02 PROJECT PHASING AND LANE REQUIREMENTS; pg. 46 <br />REPLACE with; <br />Revised SECTION 3,02 PROJECT PHASING AND LANE REQUIREMENTS; pg, 46 <br />(attached) 0- <br />SANTA ANA CITY COUNCIL <br />Miguel A. P.M. Michele Afartinez Vicente Sarmiento ,lose 5010110 P. David Benavides I Juan Vlllepas I Sal Tlnapr^ <br />Mayor Mar Rro Tom, Wald2 Wardf Ward Ward4 Ward5 WarclB <br />MPulidgp�ya-eBg,�g MM�linnztasnnlmm�o,pry VSnn 'antaCdsanla�ann.cra ,L�gl.d w• l PB"nav dnn�uannie�earn oru J�Illa� s s '•enn urn ;ztip�ef.Q(3SAO.t�.:d^...@�f9 <br />23A-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.