My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VALLEY MAINTENANCE CORPORATION
Clerk
>
Contracts / Agreements
>
V
>
VALLEY MAINTENANCE CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2022 5:26:58 PM
Creation date
6/27/2017 3:50:20 PM
Metadata
Fields
Template:
Contracts
Company Name
VALLEY MAINTENANCE CORPORATION
Contract #
A-2017-125
Agency
Parks, Recreation, & Community Services
Council Approval Date
5/16/2017
Destruction Year
0
Document Relationships
VALLEY MAINTENANCE CORPORATION (2)
(Amended By)
Path:
\Contracts / Agreements\V
VALLEY MAINTENANCE CORPORATION (3)
(Amended By)
Path:
\Contracts / Agreements\V
VALLEY MAINTENANCE CORPORATION (4)
(Amended By)
Path:
\Contracts / Agreements\V
VALLEY MAINTENANCE CORPORATION (5)
(Amended By)
Path:
\Contracts / Agreements\V
VALLEY MAINTENANCE CORPORATION (6)
(Amended By)
Path:
\Contracts / Agreements\V
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair <br />any damage, within twenty-four (24) hours of the damage incurred. <br />11.2 If the Directors Representative requests or directs the Contractor to perform work in a <br />given area, it will be the Contractor's responsibility to verify and locate any underground <br />systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br />working in these areas. <br />11.3 Contractor shall call Underground Alert (800) 422-4133) at least two working days prior <br />to digging for line locations. Any damage or problems shall be reported immediately to <br />the Director's Representative and the City of Santa Ana. If the Contractor discovers <br />something unexpected or a unique problem occurs, he should stop work and immediately <br />contact an authorized Director's Representative for a timely resolution of the problem. <br />12.0 SUBSTITUTIONS <br />Whenever a specific type of material is specified, no substitutions shall be allowed without <br />written consent of the SAPRF representative. <br />13.0 CERTIFICATION & APPLICATION OF MATERIALS <br />13.1 All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the Director's Representative. The Director's Representative <br />will not approve materials not meeting the SAPRF standards, and Contactor shall return <br />any such non -satisfactory items at his/her cost. <br />13.2 No materials shall be applied prior to the Director's Representative verifying the <br />specified quantities of materials. Furthermore, should the Contractor apply materials <br />before the Director's Representative verifies correct materials and quantities, the <br />Contractor shall not receive credit for the applied materials. The Contractor shall then <br />reorder and deliver the materials, thereby not receiving credit for the applied materials. <br />14.0 CONTRACTOR NEGLECT <br />Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined <br />to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa <br />Ana or the SAPRF. <br />I5.0 CONSTRUCTION EQUIPMENT <br />The Contractor shall take all necessary precautions for safe operation of his equipment and the <br />protection of the public from injury and damage from such equipment. <br />16.0 SOUND CONTROL REQUIREMENTS <br />The Contractor shall comply with all local sound control and noise level rules, regulations and <br />ordinances that apply to any work performed pursuant to the Contract. Each internal combustion <br />engine used for any purpose on the job or related to the job shall be equipped with a muffler of a <br />type recommended by the manufacturer of such equipment. No internal combustion engine shall <br />be operated on the project without said muffler. Full compensation for conforming to the <br />requirements of this section shall be considered as included in the prices paid for the various <br />contract items of work involved and no additional compensation will be allowed therefore. <br />Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not <br />disturb the general public. <br />
The URL can be used to link to this page
Your browser does not support the video tag.