<br />similar to Interface Coffee Breaker and follow the manufacturer's recommended
<br />procedures. Do not blot or attempt to extract. Simply spray the affected area(s).
<br />2.2.14 Remove slap tags, graffiti and any other materials used to deface the building
<br />and it amenities.
<br />2.2.15 Replace burned out lights (at the contractor's expense) Turn off lights once work
<br />is completed.
<br />2.2.16 Spray and Buffing of Hard Floors - Clean and restore a uniform glass and
<br />protective finish to resilient tile or terrazzo floors that are finished with a floor
<br />finish. All spray buff solution shall be removed from baseboards, furniture, trash
<br />receptacles, etc.
<br />2.2.17 Dusting of Ceiling, Atrium Ledges, Lunchroom Drywall Ledges and HVAC Wall
<br />Vents -Clean all HAVAC vents and area immediately surround them. Dust all
<br />atrium ledges at the glass/wood railing areas and at the atrium stairs. Dust
<br />lunchroom drywall edges. Care shall be taken not to spread dust into the air.
<br />2.2.18 High Dusting -Remove dust, cobwebs, oily film, etc., from all fixtures and surfaces
<br />above 11 feet from the floor surface. This would include lights, grills, light
<br />fixtures, pipes, sprinkler systems, cables, ledges, walls, atrium wood and ledges,
<br />ceilings, vents, etc. Care shall be taken not to spread dust into the air.
<br />2.2.19 Inspect shower curtains. If curtains are worn, the Contractor shall replace them
<br />at his own expense with a shower curtain product acceptable to the City's
<br />Representative,
<br />2.2.20 Clean light fixtures and protective coverings inside and out using approved
<br />germicidal cleanser.
<br />2.2.21 Use pumice stone or other product/tool to remove mineral buildup from around
<br />fixtures in the restroom.
<br />2.2.22 Pressure -wash all exterior wall and pavement surfaces to remove dirt, gum,
<br />dust, debris, stains, etc, to within 50' of the building.
<br />2.2.23 Tile Floors — Strip and wax all tile floors
<br />2.2.24 Clean roofs free of leaves and all other debris.
<br />2.2.25 Pressure washes metal roofs to remove dirt, dust, debris, stains, etc,
<br />2.2.26 Scrub floors and base boards completely clean of dirt, grim, stains, etc, using a
<br />power walk -behind floor scrubber and hand held power scrubber being careful
<br />not to damage flooring.
<br />2.3 PARK BUILDING MAINTENANCE -GYMNASIUM
<br />2.3.1 Clean walls and doors free of smudges, ball marks, and any other marks.
<br />2.3.2 Clean any fixtures and/or appurtenances by wiping them free of marks, dust or
<br />any other unclean material.
<br />2.3.3 Clean bleachers of trash, spills, stains, dust, dirt etc. Wipe down bleachers
<br />handrails.
<br />2.3.4 Clean, sanitize and polish all steel surfaces including but not limited to metal
<br />hardware, door handles/plates, etc.
<br />2.3.5 Clean all interior and exterior door glass.
<br />2.3.6 Polish all panic bars and kick rails.
<br />2.3.7 Clean up and organize storage areas.
<br />2.3.8 Dust off vents and other appurtenances up to 12' high.
<br />2.3.9 Clean and disinfect wall coverings dust, marks, etc. up to 12' high
<br />2.3,10 Clean up and organize the storage area,