My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - CONSTRUCTION SURVEYING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
07/05/2017
>
25A - AGMT - CONSTRUCTION SURVEYING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 2:56:08 PM
Creation date
6/29/2017 2:47:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25A
Date
7/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Horizontal control shall be based on the 1983 North American Datum (NAD83), tied to <br />it minimum of nvo proximate County of Orange, CCS83, Zone VI, 1991.35 Epoch <br />Adjustment control points. Project coordinate values shall be provided in U.S. Survey <br />Feet, The County control points shall determine the Basis of Bearing for the project. <br />E. Vertical control shall be based on the North American Vertical Datum of 1988 <br />(NAVD88), tied to a minimum of two proximate County of Orange bench marks, <br />Project elevations shall be provided in U.S. Survey Feet. <br />F. Horizontal alignment(s) for the project shall be tied to the survey centerline monuments <br />within the project area, <br />& With the coordinate values, a full location and detailed description, including point <br />character with reference(s), shall be provided for all found and set monuments for the <br />project. For this purpose, a sketch of the control network is required, <br />1-1, Copies of all survey field notes and raw data files shall be provided along with a listing <br />of the final coordinates for all surveyed points. The digital file format for the listing <br />shall be: point number, northing, casting, elevation, description (comma delineated with <br />no spaces, one point per line). The coordinate precision shall be one hundredth of a foot, <br />1. At any given time the City may need to mobilize survey crews to different project sites, <br />the consultant shall have a minimum of three (3) survey crews for mobilization. <br />J. All City CADD standards as well as Microstation configuration files are located at: <br />K. http://Hryvw.santa-ana.ora./pwa/EtigineeringSet-vices.asp <br />Consultant Responsibilities: <br />Consultant Audit and Review Process: Prior to awarding the contract, the selected Consultant <br />shall be subject to an audit or review by Caltrans' Audits and Investigations (A&I), other state <br />audit organizations, or the federal government. The selected Consultant shall complete Exhibit <br />10-K — Consultant Certification Contract Costs kind Financial, in the Appendix of this RFP as <br />Attachment 4. <br />Citv Responsibilities: <br />1. Finnish construction plans and specifications to the consultant. <br />2. Coordinate with the contractor regarding work schedule and notify the consultant 24 hours in <br />advance for the required inspections and tests, <br />Fee Proposal: <br />In addition to Section III.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be <br />structured as follows: <br />• For Caltrans funded projects, reference LAPM Exhibit 10-14 (sample cost proposal) and is <br />include in Attachment 4. <br />City of Santa Ana RPP 17-009 <br />Page Al -3 <br />25A-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.