Laserfiche WebLink
• The Contractor is required to perform field communication system repairs that include <br />installing conduit and cables; splicing of fiber optic and hard interconnect cables and <br />installing new or replacing old splice kits. Fiber optic splicing shall be by fission method and <br />Hardwire Interconnect splice shall be done using weather resistant connector (AMP Picabond <br />Connector) <br />• The Contractor is required to troubleshoot/repair and/or install CCTV cameras. <br />• The Contractor is required to troubleshoot/repair and/or install wireless communication <br />equipment. <br />• The Contractor shall furnish all tools, equipment, apparatus, facilities, labor, services and <br />materials to perform all work necessary to maintain/repair the ATMS and communication <br />systems. <br />• The contractor may utilize subcontractors and/or manufacturers with specific <br />communication, network or related expertise to provide the needed services, <br />• Work to be done is either based on time acid material or lump sum per task, to be <br />determined prior to each authorization, <br />C. LICENSES <br />The Contractor must possess or obtain a valid California Class C-10 Electrical Contractor license <br />prior to the scheduled award date of this contract. <br />D. SERVICE PERSONNEL <br />The Contractor shall provide qualified service personnel or subcontractor to maintain and to <br />service all ATMS equipment as described. Personnel shall have at least a year of, experience <br />of maintaining and troubleshooting ATMS equipment and networking equipment such as <br />Ethernet switches, routers and firewalls. <br />The Contractor shall include the ATMS maintenance personnel's qualifications in the bid. <br />The City will notify the Contractor in the City's sole opinion; personnel proposed for any <br />AIMS maintenance are not qualified to work on these systems, Within thirty (30) days after <br />City makes the determination the Contractor shall hire qualified Sub -Contractors) specialized <br />in ATMS equipment and networking for troubleshooting and repair without any additional <br />compensation from the City, <br />E, EQUIPMENT <br />The Contractor shall have access to lift/boom truck with a mininuun of 50 -foot reach <br />capability to access cameras, pan/tilt mets. <br />F. WORKING HOURS <br />The Contractor's activities shall be confined to the following hours: <br />From 7:00 am. to 5:00 pain., Monday through Friday, within work areas having either no <br />lane closures or having continuous lane closures, i.e. 24-hour closures lasting more than one <br />day. <br />City of Santa Ana RFP 17-033 <br />2P� IA 3 <br />