My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ACCO ENGINEERED SYSTEMS-2017
Clerk
>
Contracts / Agreements
>
A
>
ACCO ENGINEERED SYSTEMS-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2017 4:36:07 PM
Creation date
7/5/2017 12:54:15 PM
Metadata
Fields
Template:
Contracts
Company Name
ACCO ENGINEERED SYSTEMS
Contract #
A-2017-158
Agency
Public Works
Council Approval Date
6/20/2017
Expiration Date
12/31/2017
Insurance Exp Date
10/1/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing Siemens LAMS control points for all equipment relevant to this project shall <br />be maintained and verified when construction is .completed, <br />A now on/off status control point(s) shall be incorporated into the existing Siemens L.+MS <br />for the new VFD control, <br />Additional Siemens control points are to be determined by the City, <br />New Controls System _. Pricing to be provided by Contractor astion 12 <br />Contractor is to provide this pricing as incremental cost. In other words, the cost beyond Base <br />Option. <br />• The Contractor is to provide equipment that is compatible with DDC: Siemens <br />management system (Insight or newer). <br />• Replace the fau coil controllers on remaining (20) units with new DDC controllers that <br />were not covered in the Base Option, The quantity of (20) remaining fan coils is to be <br />verified by the Contractor <br />• The Contractor will fltraishnew DDC chilled water valves acrd DDChearing hot water <br />controls valves for remaining (20) fan coil units that were not covered In the Base Option, <br />s The Contractor will furnish new DDC zone temperature sensors for: twits. <br />• The Contractor will upgrade the existing Siemens controller (or provide new, as needed) <br />and upgrade graphics and programming, as needed <br />• Contractor to provide water balancing report to City <br />• System startup acid commissioning <br />• The new controls system will integrate All HVAC building systems, Including all fan coil <br />emits, chiller, chilled water pumps, heat rejection equipment; etc, <br />do i oW„( Fan Coil Renlmme-nt -- Pricing to be provided by Co=%,,tor as <br />Contractor Is to provide this pricing as incremental cost, In other words, the cost beyond lase <br />Option, <br />• Contractor to replace (2) additional fan coil units, 016 and 018 which serve suite 103. <br />• These additional (2) fan coil units are to be installed in accordance to .all scopeitems for <br />the fan coils identified in the Base Option, <br />City of Santa Ana RFP 17.066 <br />Page A1.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.