My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Streetcar Project <br />Traffic Study Addendum <br />List of Tables <br />Table 3-1 Intersection LOS Summary — Santa Ana Boulevard Reclassification............................................................9 <br />Santa Ana Boulevard Street Design Concept Plans <br />Table 3-2 Roadway Segment LOS Summary ...............................................................................................................10 <br />Santa Ana Boulevard Reclassfication LOS Worksheets <br />Table 3-3 Intersection LOS Summary — Santa Ana Boulevard Station Relocation......................................................10 <br />— Santa Ana Boulevard Station Relocation LOS Worksheets <br />Table 3-4 Intersection LOS Summary— Fairview Street Grade Crossing....................................................................11 <br />—Transit Signal Priority LOS Worksheet (HCM Methodology) <br />Table 3-5 Intersection AM Peak Hour Queuing Summary — Fairview Street Grade Crossing....................................12 <br />—Transit Signal Priority LOS Worksheets (ICU Methodology) <br />Table 3-6 Intersection PM Peak Hour Queuing Summary — Fairview Street Grade Crossing....................................13 <br />Design Concept LOS Worksheets (ICU Methodology) <br />Table 3-7 Intersection LOS Summary—Transit Signal Priority HCM Method.............................................................14 <br />—Street Design Concept LOS Worksheets (HCM Methodology) <br />Table 3-8 Intersection LOS Summary—Transit Signal Priority ICU Methodology......................................................15 <br />Table 3-9 LOS Summary — Street Design Concept (ICU Methodology)......................................................................16 <br />Table 3-10 LOS Summary — Street Design Concept with TSP (ICU Methodology)......................................................17 <br />Table 3-11 Intersection LOS Summary — Transit Signal Priority and Street Design Concept (HCM Methodology) ...18 <br />Appendices <br />Appendix A— <br />Santa Ana Boulevard Street Design Concept Plans <br />Appendix B - <br />Santa Ana Boulevard Reclassfication LOS Worksheets <br />AppendixC <br />— Santa Ana Boulevard Station Relocation LOS Worksheets <br />Appendix D <br />—Transit Signal Priority LOS Worksheet (HCM Methodology) <br />Appendix E <br />—Transit Signal Priority LOS Worksheets (ICU Methodology) <br />Appendix F—Street <br />Design Concept LOS Worksheets (ICU Methodology) <br />Appendix G <br />—Street Design Concept LOS Worksheets (HCM Methodology) <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.