My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Streetcar Project <br />Traffic Study Addendum <br />2.2.3 Methodology and Significance Criteria <br />The ICU method as described in Section 2.1.3 was used for the analysis of Santa Ana Boulevard/Ross Street. An <br />impact would occur at this location if the closure of the westbound free right turn lane would result in the LOS to <br />deteriorate from acceptable to unacceptable LOS. <br />2.3 Fairview Street Grade Crossing Analysis <br />2.3.1 Study Area <br />Affected Intersections <br />1. Fairview Street/Civic Center Drive <br />2. Fairview Street/5th Street <br />2.3.2 Traffic Volumes and Geometric Configuration <br />AM and PM peak hour intersection traffic volumes were based on the Year 2035 Streetcar Alternative 1 volume <br />growth contained in the Traffic Impact Assessment. The Traffic Impact Assessment conducted in 2014 does not <br />include the Fairview Street and 5th Street intersection as a study intersection. To provide consistency, existing 2016 <br />counts were conducted for both study intersections on Wednesday February 17, 2016 during the AM and PM peak <br />periods. Annual growth rates, obtained from intersection volumes for baseline and 2035 Streetcar Alternative 1 <br />from the 2014 Traffic Impact Assessment, were applied to existing 2016 counts to represent future year 2035 traffic <br />volumes. <br />Baseline intersection configurations for Fairview Street and Civic Center Drive were based on the geometrics <br />assumed as part of the 2035 Streetcar Alternative 1. Baseline intersection configurations for Fairview Street and 5th <br />Street include: <br />• Fairview Street Northbound and Southbound —1 left turn, 2 through, and 1 through right lane <br />• 5th Street Eastbound and Westbound —1 left turn, 1 through, and 1 through right lane <br />The Fairview Street grade crossing will not modify intersection configurations for both study intersections. <br />2.3.3 Methodology and Significance Criteria <br />The analysis of the proposed grade crossing and the operation of the intersections of Fairview Street/Civic Center <br />Drive and Fairview Street/5th Street with signal preemption was conducted using VISSIM, Synchro and the Highway <br />Capacity Manual (HCM) methodology (based on delay) in addition to the city -approved ICU analysis methodology. <br />The use of VISSIM as the modeling software provided the necessary detail to model streetcar operations, the grade <br />crossing, and the adjacent signalized intersections. This analysis assessed the potential delay to be experienced at <br />each location, with and without the Project. <br />® 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.