Laserfiche WebLink
HCM Signalized Intersection Capacity Analysis <br />46: Pacific & Santa Ana 1/28/2016 <br />Lane Configurations <br />I <br />T'+ <br />I <br />ft <br />F <br />44 <br />4� <br />Traffic Volume (vph) <br />15 <br />140 <br />20 <br />105 <br />480 <br />80 <br />10 <br />115 <br />65 <br />185 <br />165 <br />10 <br />Future Volume (vph) <br />15 <br />140 <br />20 <br />105 <br />480 <br />80 <br />10 <br />115 <br />65 <br />185 <br />165 <br />10 <br />Ideal Flow(vphpl) <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />1900 <br />Total Lost time (s) <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />Lane Util. Factor <br />1.00 <br />0.95 <br />1.00 <br />0.95 <br />1.00 <br />1.00 <br />1.00 <br />Frt <br />1.00 <br />0.98 <br />1.00 <br />1.00 <br />0.85 <br />0.95 <br />1.00 <br />At Protected <br />0.95 <br />1.00 <br />0.95 <br />1.00 <br />1.00 <br />1.00 <br />0.97 <br />Satd. Flow (prot) <br />1770 <br />3472 <br />1770 <br />3539 <br />1583 <br />1772 <br />1809 <br />At Permitted <br />0.95 <br />1.00 <br />0.95 <br />1.00 <br />1.00 <br />0.98 <br />0.72 <br />Satd.Flow (perm) <br />1770 <br />3472 <br />1770 <br />3539 <br />1583 <br />1734 <br />1338 <br />Peak -hour factor, PHF <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />0.92 <br />Adj. Flow (vph) <br />16 <br />152 <br />22 <br />114 <br />522 <br />87 <br />11 <br />125 <br />71 <br />201 <br />179 <br />11 <br />RTOR Reduction (vph) <br />0 <br />9 <br />0 <br />0 <br />0 <br />61 <br />0 <br />15 <br />0 <br />0 <br />1 <br />0 <br />Lane Group Flow (vph) <br />16 <br />165 <br />0 <br />114 <br />522 <br />26 <br />0 <br />192 <br />0 <br />0 <br />390 <br />0 <br />Tum Type <br />Prot <br />NA <br />Prot <br />NA <br />Perm <br />Perm <br />NA <br />Perm <br />NA <br />Protected Phases <br />7 <br />4 <br />3 <br />8 <br />2 <br />6 <br />Permitted Phases <br />8 <br />2 <br />6 <br />Actuated Green, G (s) <br />9.5 <br />23.5 <br />20.5 <br />34.5 <br />34.5 <br />72.5 <br />72.5 <br />Effective Green, g (s) <br />9.5 <br />23.5 <br />20.5 <br />34.5 <br />34.5 <br />72.5 <br />72.5 <br />Actuated g/C Ratio <br />0.07 <br />0.18 <br />0.16 <br />0.27 <br />0.27 <br />0.56 <br />0.56 <br />Clearance Time (s) <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />4.5 <br />Lane Grp Cap (vph) <br />129 <br />627 <br />279 <br />939 <br />420 <br />967 <br />746 <br />v/s Ratio Prot <br />0.01 <br />0.05 <br />c0.06 <br />c0.15 <br />v/s Ratio Perm <br />0.02 <br />0.11 <br />c0.29 <br />v/c Ratio <br />0.12 <br />0.26 <br />0.41 <br />0.56 <br />0.06 <br />0.20 <br />0.52 <br />Uniform Delay, d1 <br />56.4 <br />45.8 <br />49.3 <br />41.1 <br />35.7 <br />14.3 <br />18.0 <br />Progression Factor <br />1.00 <br />1.00 <br />1.30 <br />1.16 <br />2.04 <br />1.00 <br />1.00 <br />Incremental Delay, d2 <br />2.0 <br />1.0 <br />3.9 <br />2.1 <br />0.2 <br />0.5 <br />2.6 <br />Delay (s) <br />58.3 <br />46.8 <br />68.1 <br />49.7 <br />73.2 <br />14.8 <br />20.6 <br />Level of Service <br />E <br />D <br />E <br />D <br />E <br />B <br />C <br />Approach Delay (s) <br />47.8 <br />55.4 <br />14.8 <br />20.6 <br />Approach LOS <br />D <br />E <br />B <br />C <br />Intersection Summary <br />HCM 2000 Control Delay <br />39.9 <br />HCM 2000 <br />Level of Service <br />D <br />HCM 2000 Volume to Capacity <br />ratio <br />0.53 <br />Actuated Cycle Length (s) <br />130.0 <br />Sum of lost <br />time (s) <br />13.5 <br />Intersection Capacity Utilization <br />62.5% <br />ICU <br />Level of Service <br />B <br />Analysis Period (min) <br />15 <br />c Critical Lane Group <br />7/22015 Baseline Synchro 9 Report <br />Page 19 <br />