Laserfiche WebLink
TSP AM Mon Feb 29, 2016 12:16:35 Page 7-1 <br />OC Streetcar <br />Traffic Study Addendum <br />2035 With Transit Signal Priority ICO Results <br />Level Of Service Computation Report <br />ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative) <br />******************************************************************************** <br />Intersection #6 Ross St/Santa Ana Blvd <br />******************************************************************************** <br />Cycle (sec): 100 Critical Vol./Cap.(X): 0.585 <br />Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx <br />Optimal Cycle: 28 Level Of Service: A <br />******************************************************************************** <br />Street Name: Ross St Santa Ana Blvd <br />Approach: North Bound South Bound East Bound West Bound <br />Movement: L - T - R L - T - R L - T - R L - T - R <br />------------------------------------------------------------------------ <br />Control: Protected Protected Protected Protected <br />Rights: Include Include Include Include <br />Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Lanes: 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 3 0 1 <br />---------------------------II---------------II---------------II---------------I <br />Volume Module: <br />Base Vol: 25 310 70 70 245 120 85 675 30 210 700 180 <br />Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Initial Bse: 25 310 70 70 245 120 85 675 30 210 700 180 <br />User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />PHF Volume: 25 310 70 70 245 120 85 675 30 210 700 180 <br />Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 <br />Reduced Vol: 25 310 70 70 245 120 85 675 30 210 700 180 <br />PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />FinalVolume: 25 310 70 70 245 120 85 675 30 210 700 180 <br />---------------------------II---------------II---------------II---------------I <br />Saturation Flow Module: <br />Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 <br />Adjustment: 0.93 0.99 0.93 0.93 0.99 0.93 0.93 1.15 0.93 0.93 1.15 0.93 <br />Lanes: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 3.00 1.00 <br />Final Sat.: 1576 1675 1576 1576 1675 1576 1576 3910 1576 1576 5865 1576 <br />------------ I---------------II---------------II---------------II---------------I <br />Capacity Analysis Module: <br />Vol/Sat: 0.02 0.19 0.04 0.04 0.15 0.08 0.05 0.17 0.02 0.13 0.12 0.11 <br />Crit Moves- **** **** **** **** <br />Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to IBI GROUP, IRVINE, CA <br />