Laserfiche WebLink
Santa Ana/Garden Grove Fixed Guideway Project Addendum #2 <br />List of Figures: <br />Figure 1A <br />Traffic Signal Prioritization <br />Figure 2A <br />Track Realignment in PE ROW <br />Figure 10A <br />TPSS Locations <br />Figure 10B <br />TPSS unit 4 Location Map <br />Appendices are not included with the Addendum, but can be made available upon request. <br />List of Appendices: <br />Appendix A Visual Impact Analysis Re-evaluation Technical Memo Update (HDR, February 2017) <br />Appendix B Cultural Resources Technical Memo Update (HDR, February 2017) <br />Appendix C Traffic Study Addendum v4 (IBI Group, February 2017) <br />Appendix D Noise and Vibration Technical Addendum (HDR, February 21, 2017) <br />141 <br />Page 1170726.1 <br />