My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been no historic -era structures identified adjacent to any of the proposed locations. As such, <br />there is a change needed to include these newly proposed areas within the APE, but there are no <br />additional adjacent parcels that need to be added to the APE for consideration of indirect effects <br />as a result of this proposed work. <br />The Proposed TCE for a maintenance road turnaround on the east side of the SAR (described in <br />#3 above) is located within the mapped boundary of the Pacific Electric Santa Ana River Bridge <br />(P-30-161847). The boundary of this resource is comprised of the historic Pacific Electric Bridge <br />and the historic Pacific Electric ROW surrounding the bridge; the TCE is within the historic ROW <br />portion of the resource boundary and approximately 100 ft. northeast of the historic bridge (Figure <br />2). The feature that qualifies the Old Pacific Electric Santa Ana River Bridge as a historic property, <br />the Pegram truss, is defined by its features of a distinguishable geometric design, with the posts <br />arranged at increasing angles from the vertical chords from the center of the truss towards the <br />ends. These features are most distinguishable at the top of the bridge span. The proposed TCE <br />would be considered temporary since no permanent improvement would occur that would directly <br />effect or physically alter the character -defining feature of the Pacific Electric Railroad Bridge <br />resource. Given the temporary nature of the work, the views of the existing bridge would only be <br />partially obstructed at the base of the bridge and to a limited group of viewers, and for a limited <br />amount of time; therefore, the TCE would not substantially impair the historic bridge's activities, <br />or views of the Pegram truss architecture. The TCE will not adversely affect the integrity or <br />features and attributes that qualify the Pacific Electric Santa Ana River Bridge as a historic <br />property. Thus, there would be no adverse effects resulting from the TCE northeast of the historic <br />Pacific Electric Santa Ana River Bridge. The APE needs to be modified to include this newly <br />proposed TCE within, but there are no additional adjacent parcels that need to be added to the <br />APE for consideration of indirect effects as a result of this proposed work. <br />Figure 2. Proposed new location of TCE at the SAR, just northeast of the location of the Pacific Electric Santa Ana <br />River Bridge (P-30-161847). <br />
The URL can be used to link to this page
Your browser does not support the video tag.