My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-046 - Approving Addendum Nos. 1 and 2
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2017
>
2017-046 - Approving Addendum Nos. 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 3:00:08 PM
Creation date
7/11/2017 9:25:32 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2017-046
Date
7/5/2017
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
809
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana — Garden Grove Streetcar Project <br />Traffic Study Addendum <br />17 4t' St French St 0.45 A 0.49 A 0.46 A 0.46 A +0.01 -0.03 <br />18 4t' St Mortimer St 0.45 A 0.64 B 0.43 A 0.65 B -0.02 +0.01 <br />Notes: ICU — intersection capacity utilization (volume -to -capacity ratio) * Includes proposed Santa Ana Boulevard <br />reclassification (reduction in eastbound and westbound through lanes from 4lanes to 2 lanes). <br />'Traffic Impact Assessment (October 2012). <br />' Includes capacity adjustments (increase in capacity for streetcar movements, decrease in capacity for all other movements). <br />As shown in Table 3-8, the application of TSP (increase in capacity by 15 percent for streetcar movements with a <br />reduction in capacity by 15 percent for all other movements) to all the affected intersections would not result in <br />any deterioration of LOS from acceptable to unacceptable. Throughout the streetcar alignment, TSP would result <br />in a 0.05 decrease in ICU during the AM peak hour and 0.01 decrease during the PM peak hour. Detailed ICU <br />worksheets are provided in Appendix E. <br />3.4.3 TSP Run Time Savings <br />The following tables present the overall run time savings for all signalized intersections and at <br />Main/Broadway/Bristol, respectively. The run time savings assume a roundtrip along the streetcar alignment. <br />Table 3-9 Run Time Savings -All Signalized Intersections along Route <br />on <br />AM <br />PM <br />l Intersections Analyzed (sec / hr) <br />7TDelayReduction <br />3,030.4 <br />3,112.6 <br />vings (min./hr.) <br />50.5 <br />51.9 <br />(Minutes per Streetcar) <br />3.9 <br />3.7 <br />Table 3-10 Run Time Savings -Addition of TSP to Main/Broadway/Bristol <br />"? 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.