Laserfiche WebLink
X <br />m <br />i <br />CITY OF SANTA ANA - PUBLIC WORKS AGENCY <br />CAPITAL IMPROVEMENT PROGRAM - EXECUTIVE SUMMARY SCHEDULE <br />MONTH OF JULY 2017 <br />edit vmlatNa 1 muni - budget Times amp4 De for 7/1 L17 <br />lumbe wsa Ni na9er Wl _ M; <br />". _ _ _... <br />_. l IFt M A.,,. A� f, ,L # —Q --M J#M_&-Mz L'_ <br />PLANNING <br />Planning Protects - Coat Summary <br />F 1 Bridge Replacement <br />"re"' '.. <br />-vxdueeu <br />$ib( <br />5R-55 WhIculd8(P405 to65)(OCTALead) <br />1 <br />156827 <br />W A Improvements Main WOak (Ph 1) <br />3)th Street Geode Separmlon (ORALead) <br />1,2,3 <br />Ienenies <br />A <br />Sento Ana- Gartlan Grove Strestaar <br />.... <br />'loconaL <br />$6, <br />Bristol Specific Pian Amendment <br />5 <br />'xnanr, <br />$p <br />150 Complete 5tree6 Plan <br />I,M,5,6 <br />wears <br />$± <br />754 Circulation Element update <br />L6 <br />Iz vsiiiin <br />$; <br />Cdywide SITS Plan <br />y.6 <br />1b.1L1 <br />$i <br />756 Transportation tem Improvement Area ( ay <br />1-6 <br />svesUs <br />$$, <br />Fairviske StTraffic SYncMoniatiQn (Costa Mesa teed) <br />3,4,5,6 <br />erab4¢ <br />: <br />Traffic SignIHand Upgrades" <br />1,6 <br />$� <br />like lanes" <br />Flown, Street Dike <br />1,2,5 <br />taodniw¢- <br />'L-111 - <br />S' <br />UP Pilate!• <br />Chdo <br />1,2,4,5,6 <br />$1 <br />CNk Canter <br />Cent r Bike Ha `e roadway to Sandi .go) <br />2 <br />.1.1 <br />mzmra <br />$3: <br />985 Avenue Bike Lotus .11 )" <br />Avenue Ptected <br />4,6 <br />s <br />$: <br />Brland to <br />StreetProtectedfmtl Bicycle Lanes (Edinger Ave to Ss[5[) <br />S eave(Shape, Are SO <br />;4,5 <br />? <br />$2,1 <br />❑ncoin Pedestrian Treli" <br />UnGA <br />3 <br />m.k <br />$1I <br />Sepolvarl <br />586 <br />24 <br />500 Drainage Master PlanAlternative ImprovementAssessment]-6 <br />Drainage Masts <br />$: <br />Park Neighborhood Water Main Improvements <br />_ <br />aq9 UnartonWall <br />q <br />n aa1rI.1 <br />429 <br />Welanced provementnNUP)uctur <br />5 <br />n z. <br />$; <br />950 Advanced MeteraMnzeuctSA <br />46 <br />ambur <br />$3,: <br />659 SA Zoo Master Plan IPRCSA/SA 2ao lead) <br />Zen le <br />111..H1 <br />$: <br />DESIGN <br />Deal,. Projects - Cost Summary <br />z^ <br />$78,: <br />45 HOD Centel Cortldar(OCTA Lead) <br />1,2,3Memel <br />662 NOIrMotbblmd, grywide Case Sidewalk- Pb 2 Cabrillo Park <br />1$i <br />m urea <br />864 Omnibus Concrete Repair project (FY 15/15) <br />1-6 <br />a.m." <br />$: <br />881 Arterial Street Slurry (H 16/37) <br />;,5,6 <br />xxnurzu <br />$2,; <br />$25 Westminster Rehabilitation- Harbor to Fairview <br />3 <br />$� <br />001 South Main Street Counter Improvements <br />3,2 <br />792 Bristol St logo. Civic Center LO Washing..(PIs3A) <br />5a.Iomn1 <br />: <br />$13,: <br />741 Bristol St Improvements Warner to St. Andrew (Ph 4) <br />- ;4 <br />s ... r" <br />$2;, <br />781 Grand AV Improvements& Whicein6' Atli to 17th (Ph 2) <br />1,13 <br />'.m <br />$i <br />883 Bristol Street and Memory Lane Intersection Widening <br />3 <br />Last updated <br />19D-2 <br />F 1 Bridge Replacement <br />$624,2740014-6802 <br />O�N HOLO <br />156827 <br />W A Improvements Main WOak (Ph 1) <br />1 <br />$5839, <br />A <br />�16L6869 <br />W lter/17thTR518.1 Simon <br />ld/N rdi HC Signal Modification <br />Lead) <br />c <br />3 <br />s <br />ITBDE <br />_ <br />(I Ipl n <br />6nl Mf <br />" Pending <br />Grant <br />oxs on Tmk <br />nsaum on rarx <br />Mcnrexx <br />19D-2 <br />