Laserfiche WebLink
After your project is completely installed, operational, and meets all requirements of the Program, which is <br />described in detail in the Customized Statewide Procedures Manual for Business and at <br />www.sce.com/customized—solutions: <br />• Complete sign and submit the enclosed 2013-14 Customized Solutions Installation Report. <br />Submit final invoices and/or documentation to support project cost, clearly detailing all costs <br />associated with the project (equipment, labor, tax, etc.). <br />Submit complete engineering calculations to demonstrate energy savings and documentation, if <br />applicable (including archival diskette, CD, etc.). <br />• Submit schematic drawings and/or manufacturer specification sheets, if applicable. <br />• Operating Report, if measurement and verification is required. <br />Submit Pump Curve (if applicable) <br />NOTE: As a reminder, the deadline for the project to be completely installed and operational is one year from the date of this Project <br />Approval latter. Please submit the completed Installation Report within 30 days after installation and prior to the one year deadline, <br />Upon SCE review and approval of your completed Installation Report and supporting cost documentation, you <br />will be notified in writing. Thereafter, SCE will process the incentive check or SCE utility bill credit, as <br />applicable. If SCE is unable to approve your incentives based on the information provided, SCE may require you <br />to submit other documents related to the Project, Project site, solutions, energy savings, or any other documents it <br />requires, in its sole discretion, to make a decision on your Application. <br />If you have any questions, please contact your SCE Account Representative. You may also call its at (800) 736- <br />4777 Monday through Friday, from 8:00 a.m. to 5:00 p.m., or send an e-mail to BusinessIncentives@sce.com. <br />Please have your project number available for reference when you call and include it in any e-mail <br />correspondence. <br />Business Incentives Team <br />Southern California Edison <br />Check out www.sce.comTo sgejf ypu q�alify for the Comprehensive Bonus. <br />