My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT RINCON CONSULTANTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
25A - AGMT RINCON CONSULTANTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:38:14 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications to Provide <br />Environmental Services — Housing Division <br />Traffic Impact Analysis <br />Traffic studies will be prepared by Kunzman Associates. The typical traffic impact analysis will consist of (1) discussing <br />the proposed development with the applicant; (2) submitting a scoping agreementimemorandum of understanding, <br />including assumptions and methodology, for governmental agency approval; (3) conducting a study area field survey of <br />intersection traffic control devices, intersection approach lanes, and roadway segment through travel lanes; (4) <br />documenting existing traffic conditions; (5) obtaining weekday morning/evening peak period turning movement counts at <br />the study area intersections; (6) determining project trip generation based upon the Institute of Transportation Engineers, <br />Trip Generation Manual, 9th Edition, 2012; (7) distributing the project trip generation to the street system; (8) determining <br />the project's traffic impacts; (9) analyzing site access locations; (10) examining internal circulation including emergency <br />vehicle access; (11) mitigating the impacts, If necessary; and (12) preparing a written report that Is stamped and signed <br />by a Registered Engineer in the State of California. Mitigation measures will include roadway sizing recommendations, <br />intersection controls, and special treatments such as left turn pockets and right turn lanes as might be required by the <br />project. The traffic impact analysis will Include calculation of intersection delay utilizing the Intersection Capacity <br />Utilization (ICU) and Highway Capacity Manual (HCM) methodologies at the intersections in the project vicinity during the <br />peak hours for existing conditions as well as with the proposed project. <br />Management Team <br />Joe Power, AICP CEP, Principal <br />Education: M.A., Architecture and Urban Planning, UCLA Graduate School of Architecture and Urban Planning; <br />B.A., Urban and Economic Geography, University of Georgia <br />Certification: American Institute of Certified Planners, Certified Environmental Planner (010273) <br />Role: Contract AdministratorMPrincipal in Charge Years of Exp: 25 <br />Mr, Power is an Industry recognized leader in interpreting state and federal planning and environmental law. His <br />experience includes providing environmental documentation and regulatory permitting support to public agencies as part <br />of multi-year service contracts. This experience includes working with various Cities, Counties, and Housing Authorities <br />for more than 20years. He has prepared over 300 NEPA EAs for a variety of different projects funded through the <br />County of Los Angeles' Community Development Block Grant (CDBG) program. He has also managed preparing over <br />80 NEPA documents for the City of Oxnard's CDBG program and NEPA documentation for multiple projects for the <br />Santa Barbara County Housing Authority, the City of Ventura Housing Authority, the City of Santa Paula Housing <br />Authority, and the City County of San Francisco Mayor's Office of Housing. Previously, he oversaw the preparation of <br />EAs for the Depot at Santiago and 813.815 Harbor Boulevard residential projects for the City of Santa Ana and served <br />as the Principal in Charge of several NEPA documents including an EAIFONSI for the Veterans Village project. <br />Susanne Huerta, AICD, Senior Environmental Planner <br />Education: Master of Urban Planning; New York University, Robert Wagner Graduate School of Public Service, <br />2007; B.A., Geography; University of California, Los Angeles, 2004 <br />Certification.: American Institute of Certified Planners, Certified Environmental Planner (026358) <br />Role: Project Manager— CEQA/NEPA Documentation Years of Exp: 11 <br />Ms. Huerta, the managerof Rincon's Los Angeles office, has experience in environmental planning and has managed or <br />primarily authored successful environmental studies on projects ranging from energy development to water infrastructure <br />to commercial and residential development. Ms. Hueria has prepared numerous CEQA and NEPA environmental <br />documents that are Informative, readable, and legally defensible. She has prepared specialized technical reports on a <br />range of planning and environmental topics, including aesthetics, agriculture, land use, and policy analysis. Ms. Huerta <br />recently managed the Resort EIR for the Channel Islands Harbor and the Indus Industrial Facility MND for the City of <br />Chino Hills. Her experience with the City of Santa Ana Includes preparing the NEPA documentation for the following: <br />First Street Family Apartments, Raiff and Myrtle Street Park, 6th and Lacey Street Park, the Santa Ana Arts Collective, <br />and the Roosevelt Walker Community Center. <br />Page 6 <br />25A-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.