Qualifications to Provide
<br />Environmental Services- Housing Division
<br />Dorado Residential Development Protect EIR (2014- 20161
<br />City of Long Beach - Craig Chalfant- 562-570-6308
<br />Rincon prepared an EIR examining a proposed development Including 40 single family residences on North Norwalk
<br />Boulevard in the City of Long Beach. The project site is 5.8 -acres and is currently developed with a church facility with a
<br />parking lot, landscaped area, and a cell tower, The church would be demolished to make room for the housing
<br />development Key Issues included biological resources, cultural resources, and traffic.
<br />Holt Avenue Apartments IS -MND (2013)
<br />City of Pomona, Brad Johnson - 909.620-2191
<br />Rincon prepared an IS -MND on a proposed 62 -unit apartment complex in Pomona. The site is currently occupied by a
<br />partially occupied mobile home complex and vacant commercial buildings. The proposed project involved the relocation
<br />of the occupants of the existing partially occupied mobile home park and the demolition of site improvements. The
<br />proposed apartment complex would consist of a several two-story townhomes and a three-story apartment building, In
<br />addition, a number of the units would be designated for Mental Health Services Act housing. Key environmental Issues
<br />include historic resources, hazards/health risk, traffic, and noise.
<br />Hazards Projects
<br />Redevelopment and Housing Rehabilitation Assistance (2004- Present)
<br />City of Santa Ana Community Development Agency, George Garcia, 714-667-2254
<br />Rincon Consultants, Inc. was awarded an open services contract to conduct Phase 1 ESAs, Phase II ESAs, Remediation,
<br />and Asbestos & Lead -Based Paint Surveys for multiple sites throughout the City of Santa Ana. Since 2004, this has
<br />included more than 60 Individual projects and within the last 5 years, 25 projects have been conducted.
<br />On -Call Phase I & II Environmental Site Assessment Services (2014)
<br />City of San Diego, Real Estate Assets Department, Mary Carlson, 619-236-6079
<br />In 2014, Rincon was awarded a 5 year, $75,000 on-call contract to perform Environmental Site Assessment (ESA)
<br />services for the City of San Diego Real Estate Assets Department. As part of that contract we have completed Phase I
<br />ESAs, Phase 11 ESAs (Subsurface Investigations), and Asbestos & LBP Surveys. As requested, the Phase I ESA reports
<br />were conducted in general conformance with the ASTM Standard Practice for Environmental Site Assessments.
<br />Environmental Portfolio Consultant Services(2006-present)
<br />Richmond American Homes, Van Martin - 949-467-2648
<br />Rincon has held a master services agreement with Richmond American Homes since 2006 and has completed hundreds
<br />of Phase I ESAs and Phase II ESAs as part of Richmond American Homes' acquisition transactions over the past ten
<br />years. Sites assessed by Rincon have included vacant lots, agricultural properties, residential homes, and various
<br />commercial/Industrial facilities, including bakeries, auto dismantling facilities, junkyards, office buildings, and retail
<br />facilities. The Phase I ESAs completed for this client are typically completed within two weeks.
<br />Subconsuitants
<br />VM3 Environmental, Inc.
<br />VM3 Environmental, Inc, is the forefront leader in the environmental mold, asbestos, lead paint and allergen inspection
<br />and sampling industry since our inception in 2007. We are a MicroBusiness with certified technicians strategically located
<br />throughout Southern California allowing us to provide the highest level of service to our municipal, commercial and
<br />residential clients. Over the years, our services include building surveys, project monitoring and management, clearance
<br />inspections, air sampling, swab sampling, moisture meter readings, infrared measurement and temperature and humidity
<br />meter readings. We ensure that all OSHA, EPA, DOT, HUD and state regulations are strictly adhered to on all phases of
<br />our projects, All of our employees must conduct all work safely and in strict accordance with the plans, instructions and
<br />directions of the designated project supervisors and managers. In addition, VM3 has the specific experience in entering
<br />tenant spaces and project coordination that this proposal requires,
<br />Page i 1
<br />25A-26
<br />
|