Laserfiche WebLink
Qualifications to Provide <br />Environmental Services- Housing Division <br />Dorado Residential Development Protect EIR (2014- 20161 <br />City of Long Beach - Craig Chalfant- 562-570-6308 <br />Rincon prepared an EIR examining a proposed development Including 40 single family residences on North Norwalk <br />Boulevard in the City of Long Beach. The project site is 5.8 -acres and is currently developed with a church facility with a <br />parking lot, landscaped area, and a cell tower, The church would be demolished to make room for the housing <br />development Key Issues included biological resources, cultural resources, and traffic. <br />Holt Avenue Apartments IS -MND (2013) <br />City of Pomona, Brad Johnson - 909.620-2191 <br />Rincon prepared an IS -MND on a proposed 62 -unit apartment complex in Pomona. The site is currently occupied by a <br />partially occupied mobile home complex and vacant commercial buildings. The proposed project involved the relocation <br />of the occupants of the existing partially occupied mobile home park and the demolition of site improvements. The <br />proposed apartment complex would consist of a several two-story townhomes and a three-story apartment building, In <br />addition, a number of the units would be designated for Mental Health Services Act housing. Key environmental Issues <br />include historic resources, hazards/health risk, traffic, and noise. <br />Hazards Projects <br />Redevelopment and Housing Rehabilitation Assistance (2004- Present) <br />City of Santa Ana Community Development Agency, George Garcia, 714-667-2254 <br />Rincon Consultants, Inc. was awarded an open services contract to conduct Phase 1 ESAs, Phase II ESAs, Remediation, <br />and Asbestos & Lead -Based Paint Surveys for multiple sites throughout the City of Santa Ana. Since 2004, this has <br />included more than 60 Individual projects and within the last 5 years, 25 projects have been conducted. <br />On -Call Phase I & II Environmental Site Assessment Services (2014) <br />City of San Diego, Real Estate Assets Department, Mary Carlson, 619-236-6079 <br />In 2014, Rincon was awarded a 5 year, $75,000 on-call contract to perform Environmental Site Assessment (ESA) <br />services for the City of San Diego Real Estate Assets Department. As part of that contract we have completed Phase I <br />ESAs, Phase 11 ESAs (Subsurface Investigations), and Asbestos & LBP Surveys. As requested, the Phase I ESA reports <br />were conducted in general conformance with the ASTM Standard Practice for Environmental Site Assessments. <br />Environmental Portfolio Consultant Services(2006-present) <br />Richmond American Homes, Van Martin - 949-467-2648 <br />Rincon has held a master services agreement with Richmond American Homes since 2006 and has completed hundreds <br />of Phase I ESAs and Phase II ESAs as part of Richmond American Homes' acquisition transactions over the past ten <br />years. Sites assessed by Rincon have included vacant lots, agricultural properties, residential homes, and various <br />commercial/Industrial facilities, including bakeries, auto dismantling facilities, junkyards, office buildings, and retail <br />facilities. The Phase I ESAs completed for this client are typically completed within two weeks. <br />Subconsuitants <br />VM3 Environmental, Inc. <br />VM3 Environmental, Inc, is the forefront leader in the environmental mold, asbestos, lead paint and allergen inspection <br />and sampling industry since our inception in 2007. We are a MicroBusiness with certified technicians strategically located <br />throughout Southern California allowing us to provide the highest level of service to our municipal, commercial and <br />residential clients. Over the years, our services include building surveys, project monitoring and management, clearance <br />inspections, air sampling, swab sampling, moisture meter readings, infrared measurement and temperature and humidity <br />meter readings. We ensure that all OSHA, EPA, DOT, HUD and state regulations are strictly adhered to on all phases of <br />our projects, All of our employees must conduct all work safely and in strict accordance with the plans, instructions and <br />directions of the designated project supervisors and managers. In addition, VM3 has the specific experience in entering <br />tenant spaces and project coordination that this proposal requires, <br />Page i 1 <br />25A-26 <br />