My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT RINCON CONSULTANTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
25A - AGMT RINCON CONSULTANTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:38:14 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25A
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications to Provide <br />Environmental Services- Housing Division <br />Kunzman Associates, Inc, provides services for transportation planning/traffic engineering, parking, noise/vibration <br />studies, expert witness, peer reviews, and air quality/global climate change/health risk assessments. <br />Key Staff <br />William Kunzman, P.E., will be the Kunzman Associates, Inc. Principal -In -Charge and assure that manpower and <br />material resources are allocated to complete the project on time and within the budget. His work experience includes <br />employment by the Federal Highway Administration, the Counties of Los Angeles and Riverside, and the City of Irvine. <br />His education includes completing undergraduate studies In engineering at University of California at Los Angeles (1967) <br />and graduate studies In traffic engineering at Yale University (1968). <br />Project Experience <br />Carver Elementary School Consolidation Traffic Impact Analysis 120171 <br />First Carbon Solutions, Charles Holcombe — 909-884.2255 x1225 <br />Carver Elementary School currently serves kindergarten through 3rd grade and Romero -Cruz Elementary School <br />currently serves 4th and 5th grade students which are proposed to be relocated to Carver Elementary School. The new <br />site will serve kindergarten through 5th grade and Its capacity will Increase by 300 students. The Romero -Cruz <br />Elementary School site is proposed to be replaced with a 9th through 12th grade community day school. The traffic <br />impact analysis contains documentation of Existing traffic conditions, trips generated by the project, distribution of the <br />project trips to roads outside the project as well as calculation of Existing Plus Project traffic conditions, and Opening <br />Year (2018) traffic conditions without and with the project. <br />The Line at Santa Ana Traffic Impact Analysis (2016) <br />The Line at Santa Ana, Daryl Sequeire — 310-5520065 <br />The project site is located east of Harbor Boulevard and south of the Westminster Avenue in the City of Santa Ana. The <br />proposed mixed-use development consists of 4,000 square feet of retail land use and 228 apartment dwelling units. The <br />project site is proposed to provide access to Westminster Avenue. The traffic Impact analysis contains documentation of <br />existing traffic conditions, trips generated by the project, distribution of the project trips to roads outside the project, <br />analysis of existing plus project traffic conditions, and calculation of Opening Year traff ic conditions without and with the <br />project. <br />References <br />Rincon Consultants, Inc, is proud of its reputation as a leader in the environmental consulting industry that has been <br />developed over the past 23 years. The following references will attest to our performance on past projects. At your <br />request, we would be pleased to provide you with other references or work samples. <br />County of Los Angeles City of San lego, Real Estate City and County of San Francisco <br />Community Development Assets Department Mayor's Office of Housing and <br />Commission Mary Carlson Community Development <br />Donald Dean 519-236.6079 Eugene Flannery <br />626.586-1740 On -Call Phase I & 11 ESA Services 415-701.5598 <br />LACDC On -Call Environmental NEPA Environmental Review <br />Consulting Services Services On -Call Contract <br />Hills Richmond American Homes City of Oxnard <br />Drs Sondra Harris Kathleen Mallory <br />53 949-467-2633 805-385-8370 <br />fixed Use Phase I and Phase 11 ESA City of Oxnard CDBG Program <br />Page 13 <br />25A-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.