My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT ORANGE COUNTY WATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
25B - AGMT ORANGE COUNTY WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:38:55 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JDK:bc: 10/10/88 <br />for RETAILER's own use, and/or enter into separate agreements <br />with the proposed Project Customers in substantially the form <br />to be attached to and herein incorporated as Exhibit "C" for <br />the purchase by Project Customers of Project Water from <br />RETAILER, contingent upon its availability from OCWD. In the <br />event RETAILER and other purveyors of Project Water are <br />unable by December 1, 1988 (or as otherwise agreed to in <br />writing by OCWD) to commit to purchase for their own use, or <br />enter into agreements for the sale of, at least fifty percent <br />(50%) of the total demand, as set forth in Table 1 of Exhibit <br />"B," for Project Water each year during the term hereof, this <br />Agreement shall terminate. <br />2.3 RETAILER shall commence the purchase and resale of <br />Project Water upon receiving at least sixty (60) days advance <br />written notice from OCWD of the availability of such Project <br />Water. <br />2.4 RETAILER shall purchase the Project Water from <br />OCWD, at the point of its metered connection, for an amount <br />to be determined by the OCWD Board of Directors in its <br />discretion, not to exceed eighty percent (80%) of the "area <br />groundwater cost" as defined in Section 2.5 hereinbelow. The <br />point of connection and sale of the Project Water from OCWD <br />to RETAILER shall be at the meter which measures the flow of <br />Project Water to each Project Customer, as described in <br />Section 1.4 hereinabove. <br />2.5 For the purpose of this Agreement, the "area <br />groundwater cost" shall be the same as the fixed and variable <br />25B-12 <br />-10- <br />EXHIBIT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.