My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT ORANGE COUNTY WATER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/01/2017
>
25B - AGMT ORANGE COUNTY WATER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2017 9:38:55 AM
Creation date
7/27/2017 4:54:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JDK:bc: 10/10/88 <br />herein described purposes; and OCWD shall further obtain <br />those permits that Project Customers may be required to <br />obtain. OCWD shall cause the Project Facilities within the <br />boundaries of RETAILER to be constructed in accordance with <br />the construction standards of RETAILER in effect as of the <br />date of the award by OCWD of the contract or contracts for <br />such construction. The Project Facilities shall be owned by <br />OCWD; provided, however, that RETAILER shall perform on <br />behalf of OCWD all maintenance, repair and replacement of the <br />Project Facilities located within the boundaries of RETAILER, <br />pursuant to paragraph 4.1 hereinbelow. In this regard: <br />1.3.1 OCWD agrees to restore roads, streets, <br />alleys, avenues, highways, drainage facilities, or any <br />other public way or property used for construction, <br />operations, or maintenance of the Project Facilities <br />within RETAILER's boundaries to at least the same <br />condition existing prior to construction, operation or <br />maintenance of the Project Facilities, to the reasonable <br />satisfaction of RETAILER's Director of Public Works. <br />1.3.2 OCWD agrees to provide adequate <br />safeguards to afford security to life and property <br />during construction, operation, and maintenance of the <br />Project Facilities, with due regard being given to other <br />existing uses of public roads, streets, alleys, avenues, <br />highways, drainage facilities, public ways and property <br />within the boundaries of RETAILER. <br />25B-7 <br />-5- <br />EXHIBIT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.